Council archive · source document
Att 4 - SWMP · MCU21/0117
C4 0.017 100
C5 0.017 100
C6 0.035 37.5
C7 0.003 0
C8 0.010 0
C9 0.019 0
C10 0.017 90.4
C11 0.037 54.7
C12 0.008 0
E1 0.044 20.4
E2 0.067 29.3
E3 0.037 76.9
E4 0.020 100
E5 0.033 23.1
E6 0.018 33.2
E7 0.082 51.5
E8 0.001 100
The modelling demonstrates that there is sufficient capacity in the proposed stormwater
network and the existing downstream network to accommodate the 1% AEP storm event
without relying on overland flows. The modelling also demonstrates that the storage areas,
comprised of the 4 5,000L rainwater tanks (2.5KL/tank attenuation portion only – reuse
portion considered full at time of storms) and the bioretention areas provide sufficient
capacity so that the internal drainage network is not exceeded for the 1% AEP storm event.
The output of the hydraulic modelling showing the maximum Hydraulic Grade Lines (HGL)
for the development is provided in the Drainage Longsections within Appendix A Proposed
Development Plans.
4. STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction
and operational phase of the development. Refer to Appendix A Proposed Development
Plans for the proposed stormwater drainage layout plan.
Page 9 of 26
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 4 - SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.