Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 31, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                           COMMENTS

                                                           S2.9                                                          N/A
                                                           Streets near Public Passenger Transport facilities are
                                                                                                                         Refer to traffic engineers report
                                                           orientated to optimise the walkable catchments within 800
                                                                                                                         supporting the development.
                                                           metres walking distance;
                                                           S2.10                                                         N/A
                                                           The street network has no more than 15 percent of lots
                                                                                                                         Refer to traffic engineers report
                                                           fronting cul-de-sacs. The maximum cul-de-sac length is 120
                                                                                                                         supporting the development.
                                                           metres;
                                                            S2.11                                                        N/A
                                                            Street stubs to adjacent future development areas are
                                                            provided at spacings of 200 m or closer to enable future     Refer to traffic engineers report
                                                            street connections to be made;                               supporting the development.

                                                           S2.12                                                         N/A
                                                           Street block lengths are not more than 240 m long, and
                                                                                                                         Refer to traffic engineers report
                                                           predominantly around 150-180 m long. Street block lengths
                                                                                                                         supporting the development.
                                                           are generally shorter closer to town and neighbourhood
                                                           centres;
                                                           S2.13                                                                           ✓
                                                           Direct, safe and attractive pedestrian and cycle routes are
                                                           provided within and through the development and connect       To be complied with at detailed
                                                           to bus stops.                                                 design / construction stages.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 3 of 16
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.