Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 34, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                          COMMENTS
                                                           facilities are incorporated into developments;               Refer to traffic engineers report
                                                                                                                        supporting the development.
                                                            S3.13                                                       N/A
                                                            Pedestrian and cycle routes within or adjacent to the
                                                            development are overlooked by adjoining buildings, make     Refer to traffic engineers report
                                                            use of views and attractive sights, have lighting and are   supporting the development.
                                                            signposted;
                                                           S3.14                                                                          ✓
                                                           Suitable car restraint measures are adopted within the
                                                           development such as lower speed limits or traffic
                                                           calming measures to support greater pedestrian and           To be complied with at detailed
                                                           cycle movement;                                              design / construction stages.


                                                            S3.15                                                       N/A
                                                            Traffic management devices on potential bus routes are
                                                            provided in accordance with the accepted development        Refer to traffic engineers report
                                                            subject to requirements code for undertaking road works     supporting the development.
                                                            on local government roads, under the Transport Planning
                                                            and Coordination Regulation 2005;
                                                            S3.16                                                       N/A
                                                            Streets identified as potential bus routes are—             Refer to traffic engineers report
                                                            a)    collector streets and sub-arterial/arterial roads
                                                                                                                        supporting the development.
                                                                  which provide highly accessible and relatively
                                                                  direct routes wherever practical;
                                                            b)    those that provide for the shortest and most
                                                                  direct route for an efficient public transport
                                                                  service; and



 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 6 of 16
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.