Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 13.2 Prescribed tidal work that is a private       (s 6(2) solution)                                                    Not applicable
 boat ramp or private slip way is designed and      The design and construction of the boat ramp or slip way is
 constructed in a way to ensure the safe            consistent with the following standards—(a) subject to paragraph
 movement of vehicles or persons over the boat      (d), the upper surface of a boat ramp or slip way has a width of
 ramp or slip                                       no less than 3.6m; (b) subject to paragraph (d), the whole
 way.                                               upper surface of a boat ramp or slip way is treated to prevent it
                                                    from becoming slippery by using any of the following methods—
                                                    (i) forming grooves over the surface, as close as possible to
                                                    40mm wide, 20mm deep and 150mm apart, and at an angle
                                                    as close as possible to 70º to the centre-line of the boat ramp or
                                                    slip way; (ii) covering the surface with a substance ordinarily
                                                    used on slippery surfaces to prevent
                                                    skidding; (iii) making, through a physical act, the surface coarse
                                                    before it sets, including, for example, by raking the surface;
                                                    (c) subject to paragraph (d), the upper surface of a boat ramp or
                                                    slip way for which a winch is not used to hoist or haul vessels
                                                    onto the boat ramp or slip way is at a gradient of not steeper
                                                    than— (i) if the surface is treated by using a method mentioned
                                                    in paragraph (b)(i) or (ii)—1:8; or (ii) otherwise—1:10;
                                                    (d) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a), (b) or (c)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a), (b) or (c).




                                                                    Design, construction and safety - bridges
 14.1 Prescribed tidal work that is a bridge does   The design and construction of the bridge, including any             Not applicable
 not adversely affect existing public use of any    abutment connected with the bridge, is consistent with the
 tidal water, including, for example, use of the    following standards— (a) subject to paragraph (b), the clearance
 tidal water for canoeing, swimming or other        levels under a bridge are high enough to allow continued
 recreational activities.                           public use of any tidal water over which it is constructed;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).




                                                                                                                                          15
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.