Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

 14.2 Prescribed tidal work that is a bridge      The design and construction of the bridge is consistent with the     Not applicable
 does not adversely affect the flow of water      following standards—
 under the bridge.                                (a) subject to paragraph (b)— (i) if a bridge can be adequately
                                                  supported without erecting or placing a foundation support in
                                                  tidal water—no foundation support to support the bridge is
                                                  erected or placed in the tidal water; or
                                                  (ii) otherwise—only the minimum number of foundation supports
                                                  required to support the bridge is used;
                                                  (b) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a)—the relevant planning
                                                  scheme standard, to the extent it is more stringent than the
                                                  standard mentioned in paragraph (a).




                                                  Design, construction and safety - boardwalks and independent decks
 15.1 Prescribed tidal work that is a boardwalk   (s 6(2) solution)                                                     Not applicable
 or an independent deck and for a private         The design and construction of the boardwalk or deck is
 purpose is designed and constructed in a way     consistent with the following standards—
 to ensure it is able to support its intended     (a) subject to paragraph (d), a boardwalk or independent deck
 loads, having regard to its relevant loading     accessible to vehicular traffic is able to support at least a live
 matters.                                         load of 3.0kPa plus an axle load of 10kN; (b) subject to
                                                  paragraph (d), a boardwalk or independent deck that
                                                  is not accessible to vehicular traffic and that is for individual use
                                                  is able to support at least a live load of 2.0kPa;
                                                  (c) subject to paragraph (d), a boardwalk or independent deck

                                                                                                                                         16
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.