Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
that is not accessible to vehicular traffic and that is for group use
is able to support at least a live load of 3.0kPa; (d) if a relevant
planning scheme standard is more stringent than the
standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a), (b) or (c).
15.2 Prescribed tidal work that is a boardwalk (s 6(2) solution) The design or construction of the boardwalk or Not applicable
or an independent deck and for a non-private deck is consistent with the following standards—
purpose is designed and constructed in a way (a) subject to paragraph (c), a boardwalk or independent deck
to ensure it is able to support its intended accessible to vehicular traffic is able to support at least the
loads, having regard to its relevant loading following— (i) a distributed live load of 5.0kPa; (ii) a
matters. concentrated live load of 4.5kN; (iii) the load of the largest
vehicle capable of being on the boardwalk or deck;
(b) subject to paragraph (c), a boardwalk or independent deck
not accessible to vehicular traffic is able to support at least the
following— (i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 4.5kN; c) if a relevant planning
scheme standard is more stringent than the standard mentioned
in paragraph (a) or (b)—the relevant planning scheme standard,
to the extent it is more stringent than the standard mentioned in
paragraph (a) or (b).
15.3 Prescribed tidal work that is a boardwalk The design and construction of the boardwalk or deck is Not applicable
or an independent deck does not prevent or consistent with the following standards—
hinder remedial work being undertaken on any (a) subject to paragraph (b), a boardwalk or independent deck
bank of tidal water or for any existing retaining either— (i) can be easily dismantled and reassembled; or
wall, revetment or seawall or another existing (ii) does not restrict the movement of machinery ordinarily used
structure. for remedial work to any bank of tidal water or any existing
retaining wall, revetment or seawall or other existing
structure; (b) if a relevant planning scheme standard is more
stringent than the standard mentioned in paragraph (a)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
Design, construction and safety - jetties and piers
Prescribed tidal work that is a jetty or The design and construction of the jetty Not applicable
pier and for a private purpose is designed and or pier is consistent with the following
constructed in a way to ensure it is able to standards—
support its intended loads, having regard to its (a) subject to paragraph (d), a jetty or pier accessible to
relevant loading matters. vehicular traffic is able to support at least a live load of
3.0kPa plus an axle load of 10kN; (b) subject to paragraph (d), a
jetty or pier that is not accessible to vehicular traffic and that is
for individual use is able to support at least a live load of 2.0kPa;
(c) subject to paragraph (d), a jetty or pier that is not accessible
to vehicular traffic and that is for group use is able to support at
17
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work