Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
least a live load of 3.0kPa; (d) if a relevant planning scheme
standard is more stringent than the standard mentioned in
paragraph (a), (b) or (c)—the relevant planning scheme
standard, to the extent it is more stringent than the standard
mentioned in paragraph (a), (b) or (c).
16.2 Prescribed tidal work that is a jetty or The design and construction of the jetty or pier is consistent with Not applicable
pier and for a non-private purpose is designed the following standards—
and constructed in a way to ensure it is able to (a) subject to paragraph (c), a jetty or pier accessible to
support its intended loads, having regard to its vehicular traffic is able to support at least the following—
relevant loading matters. (i) a distributed live load of 5.0kPa; (ii) a concentrated live load of
4.5kN; (iii) the load of the largest vehicle capable of being on or
moored at the jetty or pier; (b) subject to paragraph (c), a jetty or
pier not accessible to vehicular traffic is able to support at least
the following— (i) a distributed live load of 5.0kPa; (ii) a
concentrated live load of 4.5kN;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
16.3 Prescribed tidal work that is a jetty or The design and construction of the jetty or pier is consistent with Not applicable
a pier is designed and constructed in a way to the following standards—
ensure it remains above water at all times. (a) subject to paragraph (b), either— (i) the level of the deck of a
jetty or pier is at least 300mm above the water at highest
astronomical tide; or (ii) piles or other markers indicate
the presence of the jetty or pier when it is inundated;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
18
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work