Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

 16.4 Prescribed tidal work that is a jetty or pier   The design and construction of the jetty or pier is consistent with      Not applicable
 and for a private purpose is designed and            the following standards—
 constructed in a way to ensure it is of a size       (a) subject to paragraph (b), all parts of the deck of a jetty or pier
 suitable for maritime use while still minimising     have a width of at least 900mm and not more than 3m;
 the amount of tidal water occupied by it.            (b) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a)—the relevant planning
                                                      scheme standard, to the extent it is more stringent than the
                                                      standard mentioned in paragraph (a).




                                                 Design, construction and safety - Pipelines and other underground services
 17.1 The design and construction of                The design and construction of the pipeline or underground          Not applicable
 prescribed tidal work that is a pipeline, or       service is consistent with the following standards—
 another underground service used instead of a (a) subject to paragraph (b), a pipeline or other underground
 pipeline, does not adversely affect the ability    service is installed at least 1.2m below the surface of land, after
 of vessels to be anchored near the work.           it is installed;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).




                                                                                                                                                19
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.