Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Character and amenity (height, scale and size)
3.1 Prescribed tidal work is of a height, scale The height, scale and size of the prescribed tidal work is The proposed work considers the
and size to ensure the work is compatible with consistent with each relevant planning scheme standard. - Height, being located relative to the local
the character and amenity of its location, tidal planes in each specific location.
having regard to the following— - Scale & Size, being a significantly lower area
(a) the height, scale and size of the natural than the historically present oyster reef
features of the work’s immediate surroundings populations, however expected to naturally
and the locality within which the work is expand over time in areas where they are
located; successfully established (and as a result of
(b) the height, scale and size of the existing any future stages).
buildings or other structures in the work’s
immediate surroundings and the locality within
which the work is located;
(c) if the relevant planning scheme states the
desired height, scale or size of buildings or
other structures in the work’s immediate
surroundings or the locality within which the
work is located—the stated desired height,
scale or size.
Character and amenity (materials and colours)
4.1 The materials used for, and the colours of, The materials used for, and colours of, the prescribed tidal work The proposed work is within natural areas of the
prescribed tidal work are compatible with the are consistent with each relevant planning scheme standard. Noosa River and the Noosa River Fish Habitat Area.
character and amenity of the work’s location, The oyster shell used is locally sourced (from Moreton
having regard to the following— Island and boiled in accordance with biosecurity
(a) the natural features of the work’s principals) and is the most suitable material to act as a
immediate surroundings and the locality within substrate for recruiting oysters.
which the work is located;
(b) the existing buildings or other structures in Other materials used to provide stability in the interim
the work’s immediate surroundings and the as reefs become established are coir, Manilla rope.and
locality within which the work is located; timber. All materials are biodegradable and suitable
(c) if the relevant planning scheme states the for the environment.
desired materials to be used for, or desired
colours of, buildings or other structures in
the work’s immediate surroundings or the
locality within which the work is located—the
stated desired materials or colours.
3
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.