GENERAL COMMITTEE MEETING AGENDA   12 NOVEMBER 2018




                                        Page 46 of 84

GENERAL COMMITTEE MEETING AGENDA                                         12 NOVEMBER 2018

                                                                              2007/2446

             All contributions must be paid prior to commencement of the use.
       General
       47.    A Construction Management Plan for each separate demolition and construction phase of
             the development shall be submitted to and approved by Council at least 5 working days prior
             to the commencement of any Demolition or Building works or at least 5 working days prior to
              the pre-start meeting for Operational Works. The Construction Management Plan shall
              include but not be limited to:
              47.1.  Traffic control measures to ensure safety and traffic flow is maintained in Pacific
                     Avenue;
              47.2. Limiting the routes for the heavy vehicles to the major road network and prohibit the
                     use of the local roads:
              47.3. Maintaining pedestrian access and safety along the frontage of the site;
              47.4.  Indicate provision for on-site and off-site parking for the required workforce;
              47.5.  Indicate the location of loading and unloading areas,
              47.6.  Indicate the location of any “holding” areas for heavy vehicles:
              47.7. Operating hours and
              47.8.  Strategy to protect Council's existing infrastructures.
      48.    Any damage caused to any public utility (eg pipelines, drainage pits, pathways, roads etc)
              during the course of construction shall be repaired to Council's standards and at no cost to
              Council.
       49.   Any alteration of any public utility or other facilities necessitated by the development of the
             land or associated construction works external to the site shall be at no cost to Council.
      50.    The transportation of all materials to and from the site shall be undertaken in a manner such
              that no particle matter escapes onto a public road. All vehicles carrying materials either to or
             from the site shall be covered to prevent materials including dust being windblown from the
              vehicle.
       Refuse
       51.   The developer must provide waste storage and disposal facilities in accordance with
             Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
              industrial Premises”, including an external imperviously paved area correctly sized for all
             refuse and recycling containers and suitably screened from public places and neighbouring
             properties. A bin wash area is required with a cold-water tap, hose and drain outlet
             connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
              water entry to the sewerage system and this can be achieved with a nib wall 50mm high and
             up to 700mm «x 700mm wide (max 0.5m), or alternatively the waste area can be roofed, or
             any other design approved by Council.
       52.   Refuse containers must be provided in accordance with the requirements of the
              Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
              Regulation 2000, for the storage and collection of refuse.
       53.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
              “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
             submitted for the day-to-day operation of the development and approved by Council's Health
             Section prior to issue of development permit for operational works.
             it is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
              explaining exactly how to predict waste quantities and design waste areas is available from
             Council and the web. The Plan shall include the following information: -
                                                                            Page 8 of 17

                                                                                Page 46 of 84
Log in to download the original file

2018-11-12 General Committee Meeting Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.