GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
Page 46 of 84
GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
2007/2446
All contributions must be paid prior to commencement of the use.
General
47. A Construction Management Plan for each separate demolition and construction phase of
the development shall be submitted to and approved by Council at least 5 working days prior
to the commencement of any Demolition or Building works or at least 5 working days prior to
the pre-start meeting for Operational Works. The Construction Management Plan shall
include but not be limited to:
47.1. Traffic control measures to ensure safety and traffic flow is maintained in Pacific
Avenue;
47.2. Limiting the routes for the heavy vehicles to the major road network and prohibit the
use of the local roads:
47.3. Maintaining pedestrian access and safety along the frontage of the site;
47.4. Indicate provision for on-site and off-site parking for the required workforce;
47.5. Indicate the location of loading and unloading areas,
47.6. Indicate the location of any “holding” areas for heavy vehicles:
47.7. Operating hours and
47.8. Strategy to protect Council's existing infrastructures.
48. Any damage caused to any public utility (eg pipelines, drainage pits, pathways, roads etc)
during the course of construction shall be repaired to Council's standards and at no cost to
Council.
49. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
50. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Refuse
51. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties. A bin wash area is required with a cold-water tap, hose and drain outlet
connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
water entry to the sewerage system and this can be achieved with a nib wall 50mm high and
up to 700mm «x 700mm wide (max 0.5m), or alternatively the waste area can be roofed, or
any other design approved by Council.
52. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
53. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the development and approved by Council's Health
Section prior to issue of development permit for operational works.
it is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
explaining exactly how to predict waste quantities and design waste areas is available from
Council and the web. The Plan shall include the following information: -
Page 8 of 17
Page 46 of 84See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.