Skip to the record
Accept no imitations.

Original source · versioned page text

2018-11-12 General Committee Meeting Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 NOVEMBER 2018




                                        Page 47 of 84

GENERAL COMMITTEE MEETING AGENDA                                           12 NOVEMBER 2018

                                                                              2007/2446

               e The types of waste that will be generated from the activities approved within the
                  development.
               « Estimated volumes or tonnage of both recyclables and waste generated.
               * Methods to be used for dealing with garden waste.
               « = Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
               e Description of procedures for getting all waste to the bins; the storage of bins and the
                  collection of bins by the contractor.
               e  A description of the design details of waste storage and recycling areas including size,
                 location, elevation and floor plan, methods of bin washing and system to prevent storm
                 water getting into sewer via the bin wash.
               e  Adescription of types and volume of waste storage containers to be used.
               * The waste and recycling storage area shall include the provision of containers for all
                 waste and recycling materials including putresable matter, non-recycling waste, paper/
                  cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin
                 washing facilities connected to sewer.
               e  A detailed description of vehicular access to collect waste. Where collection is off
                 street, access must allow vehicles to enter and leave the site in a forward direction.
       54.    A Waste Management Plan (construction and demolition) shall be submitted prior to
             demolition, removal or relocation of any building other than a shed
            Waste Management Plans (construction and demolition) are required to be submitted in
           accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
            Waste storage areas are to provide for adequate separation of all reusable, recyclable and
            waste materials. These shall be located so that they are convenient and safe to use. (Refer to
            Noosa Council Waste Management Code)
            The Plan shall contain the following information:
              .    The site area for the storage and separation of waste is to be shown on the plan
                   drawings accompanying the application.
              .    A waste management table as indicated below is to be completed showing how waste
                   material is to be segregated - recycled — reused or disposed.

                                                                             Page 9 of 17

                                                                                  Page 47 of 84
Log in to download the original file

2018-11-12 General Committee Meeting Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.