Construction Management Plan_OPW25_0036_45 Cormorat Crescent Peregian Beach

of 9

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
MAP LOCATION, 45 Cormorant Crescent




SCOPE OF WORKS
Gold leaf Constructions will be conducting Proposed Civil Works at 45 Cormorant Crescent
Works will be under Hold & Release.
Signage to be set up and monitor, if required additional Signage will may be installed to help
with reducing the Speed of the Road Users
Refer to attached TGS




REFERENCES
* QGTTM: QUEENSLAND GUIDE TO TEMPORARY TRAFFIC MANAGEMENT
* AGTTM: AUSTROADS GUIDE TO TEMPORARY TRAFFIC MANAGEMENT
* TRANSPORT AND MAIN ROADS MRTS02 PROVISION FOR TRAFFIC
* TRANSPORT AND MAIN ROADS MRTS02 GUIDE TO TRAFFIC MANAGEMENT.
* TRANSPORT AND MAIN ROADS (ROAD USE MANAGEMENT) ACT 1995
* TRAFFIC CONTROLLER ACCREDITATION SCHEME APPROVED PROCEDURE [TCASAP]
* TRAFFIC MANAGEMENT FOR CONSTRUCTION OR MAINTENANCE WORK CODE OF PRACTICE 2008
* RISK MANAGEMENT GUIDELINES. COMPANION TO AS/NZS 2004




                                          Date: 16/04/2025 Author: Chris Wright #OP630 TGS Drawing Number: 172294-1
                                          Rev: 0
                                          Comments:
                                          Type of Works: Proposed Civil Works
                                          Where: 45 Cormorant Crescent
                                          Date of Works: TBA
                                          Time of Works: TBA
                                          Drawing not to scale

                                          Site Contact: Klint Grabbe 0474 764 761
                                          ECTC Nominated Traffic Officer: Chris Wright 0475 420 223

                                          East Coast Traffic Controllers Pty Ltd
                                          Copyright protects this publication except for the purpose permitted by the copyright act reproduction by whatever means is prohibited without prior permission of ECTC.
     INFORMATION ONLY                     If ECTC is not the responsible contractor for implementing the requirements of this plan ECTC takes no responsibility for any accident, incident or other issues that may arise
Log in to download the original file

Construction Management Plan_OPW25_0036_45 Cormorat Crescent Peregian Beach.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.