Original source · versioned page text
Seaview Terrace Target Program Rev 2 MM
Attached to the e-mail MCU14/0084 & OPW16/0021 Construction Management Plan - 71 Seaview Terrace.
SEAVIEW TERRACE
CONSTRUCTION PROGRAM - TARGET
DRAFT
ID Task Name Duration Start Finish July August September
OctoberNovember
December
January February
March April May June July August September
OctoberNovember
December
January February
March April May June July August September
OctoberNovember
December
January February
Ma
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
172 Form Roof 2 wks Tue 6/02/18 Mon 19/02/18 Form Roof
173 Reinforce Slab 2 wks Tue 13/02/18 Mon 26/02/18 Reinforce Slab
174 Pour Slab 5 days Tue 27/02/18 Mon 5/03/18 Pour Slab
175 Strip Suspended Slab 4 days Tue 27/03/18 Tue 3/04/18 Strip Suspended Slab
176 SERVICES 20 days Wed 4/04/18 Wed 2/05/18 SERVICES
177 LIFT 20 days Wed 4/04/18 Wed 2/05/18 LIFT
178 Install Structural Steel to Lift 1 wk Wed 4/04/18 Tue 10/04/18 Install Structural Steel to Lift
179 Install Lift 3 wks Wed 11/04/18 Wed 2/05/18 Install Lift
180 FAÇADE 149 days Wed 13/09/17 Tue 8/05/18 FAÇADE
181 BASEMENT 23 days Thu 12/10/17 Mon 13/11/17 BASEMENT
182 Install Structural Steel for Window Framing 5 days Thu 12/10/17 Wed 18/10/17 Install Structural Steel for Window Framing
183 Waterproof Window and Door Openings 3 days Thu 19/10/17 Mon 23/10/17 Waterproof Window and Door Openings
184 Install Alumnium Windows and Doors 3 wks Tue 24/10/17 Mon 13/11/17 Install Alumnium Windows and Doors
185 LEVEL 1 48 days Wed 14/02/18 Tue 24/04/18 LEVEL 1
186 Install Structural Steel for Window Framing 5 days Wed 14/02/18 Tue 20/02/18 Install Structural Steel for Window Framing
187 Waterproof Window and Door Openings 3 days Wed 21/02/18 Fri 23/02/18 Waterproof Window and Door Openings
188 Install Alumnium Windows and Doors 3 wks Mon 26/02/18 Fri 16/03/18 Install Alumnium Windows and Doors
189 Install Timber Eyelids 5 wks Mon 19/03/18 Tue 24/04/18 Install Timber Eyelids
190 LEVEL 2 23 days Wed 4/04/18 Tue 8/05/18 LEVEL 2
191 Install Structural Steel for Window Framing 5 days Wed 4/04/18 Tue 10/04/18 Install Structural Steel for Window Framing
192 Waterproof Window and Door Openings 3 days Wed 11/04/18 Fri 13/04/18 Waterproof Window and Door Openings
193 Install Alumnium Windows and Doors 3 wks Mon 16/04/18 Tue 8/05/18 Install Alumnium Windows and Doors
194 Install Panel Lift Garage Door 1 wk Wed 4/04/18 Tue 10/04/18 Install Panel Lift Garage Door
195 Install Sliding Curved Garage Door 1 wk Wed 11/04/18 Tue 17/04/18 Install Sliding Curved Garage Door
196 MAIN FEATURE STAIR 77 days Wed 13/09/17 Fri 19/01/18 MAIN FEATURE STAIR
197 FRP Basement to Level 1 2 wks Wed 13/09/17 Tue 26/09/17 FRP Basement to Level 1
198 Install Steel Treads 3 wks Mon 30/10/17 Fri 17/11/17 Install Steel Treads
199 Tile Finish to Concrete Treads / Risers 2 wks Wed 27/09/17 Wed 11/10/17 Tile Finish to Concrete Treads / Risers
200 Install Glass Treads 1 wk Mon 20/11/17 Fri 24/11/17 Install Glass Treads
201 Install Handrail Basement to Level 1 2 wks Mon 27/11/17 Fri 8/12/17 Install Handrail Basement to Level 1
202 Install Handrail Level to Level 2 2 wks Mon 11/12/17 Fri 22/12/17 Install Handrail Level to Level 2
203 Install Balustrade Level 2 1 wk Mon 15/01/18 Fri 19/01/18 Install Balustrade Level 2
204 FINISHES 287 days? Mon 12/06/17 Thu 16/08/18 FINISHES
205 POOL BASEMENT 16 days Mon 12/06/17 Tue 4/07/17 POOL BASEMENT
206 Watertight 0 days Mon 12/06/17 Mon 12/06/17 Watertight
207 Floor & Wall Finishes 4 days Tue 13/06/17 Fri 16/06/17 Floor & Wall Finishes
208 Rough-In Plumbing 3 days Mon 19/06/17 Wed 21/06/17 Rough-In Plumbing
209 Rough-In Electrical 3 days Mon 19/06/17 Wed 21/06/17 Rough-In Electrical
210 Fit-Off Plumbing 3 days Thu 22/06/17 Mon 26/06/17 Fit-Off Plumbing
211 Fit-Off Electrical 3 days Thu 22/06/17 Mon 26/06/17 Fit-Off Electrical
212 Install Pool Equipment 2 wks Mon 19/06/17 Fri 30/06/17 Install Pool Equipment
213 Install Door D41 2 days Mon 3/07/17 Tue 4/07/17 Install Door D41
214 BASEMENT 53 days Wed 11/10/17 Mon 15/01/18 BASEMENT
215 Watertight 0 days Wed 11/10/17 Wed 11/10/17 Watertight
216 Install Hempcrete Walls 5 days Thu 12/10/17 Wed 18/10/17 Install Hempcrete Walls
217 Metal Wall Framing 5 days Thu 19/10/17 Wed 25/10/17 Metal Wall Framing
218 Ceiling Framing 5 days Thu 19/10/17 Wed 25/10/17 Ceiling Framing
219 Rough-In Hydraulic 3 days Thu 26/10/17 Mon 30/10/17 Rough-In Hydraulic
220 Rough-In Electrical 3 days Thu 26/10/17 Mon 30/10/17 Rough-In Electrical
221 Rough-In Mechanical 4 days Thu 12/10/17 Tue 17/10/17 Rough-In Mechanical
222 Gyprock Wall Linings 6 days Tue 31/10/17 Tue 7/11/17 Gyprock Wall Linings
223 Gyprock Ceiling Linings 6 days Tue 31/10/17 Tue 7/11/17 Gyprock Ceiling Linings
224 Waterproofing 4 days Wed 8/11/17 Mon 13/11/17 Waterproofing
225 Carpentry - Doors and Hardware 5 days Wed 8/11/17 Tue 14/11/17 Carpentry - Doors and Hardware
226 Carpentry - Feature Timber Walls to Theatre 3 days Wed 8/11/17 Fri 10/11/17 Carpentry - Feature Timber Walls to Theatre
227 Floor Tiling - Rec Room & Lounge 5 days Wed 8/11/17 Tue 14/11/17 Floor Tiling - Rec Room & Lounge
228 Floor Tiling - Wet Areas 5 days Tue 14/11/17 Mon 20/11/17 Floor Tiling - Wet Areas
Task Summary External Milestone Inactive Summary Manual Summary Rollup Finish-only Critical Split
Project: Seaview Terrace Program
Split Project Summary Inactive Task Manual Task Manual Summary Deadline Progress
Date: Fri 5/08/16
Milestone External Tasks Inactive Milestone Duration-only Start-only Critical
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.