Original source · versioned page text
MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
S30.2 Direct pathway access is provided to the public save and convenient pathway from the front entrance of the
transport facility if the facility is contained on site or within building. This stop is within 50m of the proposed
50m from the property boundary. development. Council is directed to Appendix B –
Architectural Plans and Appendix E – Traffic Impact
Assessment for further details
O31 Business Uses are designed and constructed to S31.1 Safe and convenient cycle access to and from the site Complies – The proposed staged development has been
encourage users of the development to access the site by from the existing road and bicycle network, and safe pathway designed to ensure safe and adequate pedestrian and cycle
means of foot or bicycle through provision of appropriate end- movement within the site is provided; access. The development includes clear paved footpaths and
of-trip facilities including bicycle parking and AND internal pathways direct to the building access points.
S31.2 Secure and convenient parking space for bicycles is
provided on site in accordance with AS2890.3 Bicycle There is a bicycle parking rack located within the existing
Parking Facilities and Figure 14-1 Minimum Requirements for under croft carpark. This parking rack can accommodate up
Bicycle Parking; to five (5) bicycles and is considered to be sufficient to
AND accommodate existing and future cycle parking demands
S31.3 Where at least 5 bicycle parking spaces are required in generated by the RSL.
accordance with Figure 14-1 Minimum Requirements for
Bicycle Parking, end-of-trip cycle facilities are provided at the The RSL does include additional facilities for staff including
following rate: lockers and shower cubical. This is located within the existing
a) 1 locker per 2 bicycle parking spaces; and staff rooms. All bicycle facilities are designed in accordance
b) 1 shower cubicle with ancillary change rooms per 10 with the austroad standards.
bicycle spaces or part thereof;
AND
S31.4 Bicycle parking spaces and cyclist facilities are
designed in accordance with AUSTROADS Guide to Traffic
Engineering Practice, Part 14 – Bicycles, Section 10;
AND
S31.5 On-site pedestrian facilities such as seating and shade
structures are provided in developments for the convenience
of persons walking to the site.
July 2016 Page | 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.