MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
98.5m AHD level.
Electricity supply infrastructure S6.1 Buildings and structures (including swimming pools, Complies with the Probable Solutions– The proposed
O6 Uses and works maintain an adequate safe distance from sheds, tennis courts or outbuildings) are not constructed stage development will not be constructed under overhead
electrical infrastructure including substations, overhead under overhead electricity transmission lines, or within electricity transmission lines, or within electricity easements.
powerlines, power poles and transformers. electricity easements. Council is directed to Appendix B – Architectural Plans for
further details.
Steep slopes and Landslide hazard areas S7.1 If on premises identified as a Landslide Hazard Area on N/A – The proposed development is for an Undefined Use. It
O7 Detached houses and associated uses are sited or Overlay Maps OM1.3–9.3 or on steep slopes, the use does is not proposed on a site which has a steep slope or is
constructed to maintain the safety of people and property not— subject to a landslide hazard area.
from the risk of landslide. e) involve the removal of vegetation other than grass
from use areas;
f) involve excavating or filling of more than 50m3 of
material (other than placement of topsoil not
exceeding 100mm in depth relative to natural
ground level;
g) involve cut or fill with a vertical depth of more than
2m relative to natural ground level;
h) redirect or impede water flows in an existing
watercourse or stormwater drain; or
i) involve construction of an on-site effluent disposal
system;
OR
S7.2 A site specific geo-technical report prepared by a
registered professional engineer either—
a) certifies that the site is not at risk from landslide
emanating from the site or from other land; or
b) identifies methods of stabilising all buildings,
accessways and use areas;
AND
S7.3 If the geo-technical report identifies methods of
stabilising buildings, accessways and use areas, those
methods are implemented.
Gas Pipeline S8.1 No new buildings for the purpose of Residential Uses N/A – The subject site is not subject to a Gas Pipeline as
O8 Adequate separation is provided between the new (except for a Detached house or class 10 building), noted within the Overlay Maps. It is considered the
building works and the gas pipeline shown on Overlay Maps Education uses, Wellbeing uses or Retail business uses construction of the proposed development will be completed
OM3.5 or OM5.5; are within 200m of the gas pipeline shown on Overlay Maps to ensure Council’s infrastructure is maintained.
OM3.5 or OM5.5;
AND AND
O9 Building works are constructed and operated to avoid S8.2 Any building works for the purpose of storage of
July 2016 Page | 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.