MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
drainage is collected and treated prior to transfer to the legal
point of discharge.
O21 Carparking areas are designed to ensure drainage No solution provided Complies with the Probable Solution – The proposed
without the use of pumps or other electrical apparatus. development has been designed to included adequate
drainage and treatment facilities for the carparking areas. All
drainage is collected and treated prior to transfer to the legal
point of discharge.
O22 Site layout and building design provides for soft S22.1 Below ground components of buildings, including car Complies with the Probable Solution – The proposed
landscaping to be established. parks, do not extend beyond the above ground footprint to development includes a basement level parking. The
allow for the provision of landscaping, particularly within development also includes significant landscaper buffers
building setbacks. along the perimeter of the site. It is considered the proposed
landscaping adequately diverts sightlines from the parking
areas to the building facade and the architectural features of
the proposed building. Council is directed to Appendix C –
Statement of Landscaping Intent for further details.
Education Types 1, 2 or 3 S23.1 Paved setdown areas are provided within the site; N/A
O23 Carparking and setdown areas are designed and located AND
to facilitate their safe and efficient use. S23.2 For a minimum of 50% of carparking spaces,
pedestrian access to buildings is not across or through
driveways, carparks, setdown or manoeuvring areas;
AND
S23.3 Carparking and setdown areas are visible from off-site.
Earthworks Code (Division 14)
Table 14-52 — Earthworks
Column 2
Column 1
Acceptable solutions (if self-assessable) Compliance
Specific Outcomes
Probable solutions (if code assessable)
14.120 Effects of works
Drainage S1.1 The finished surface gradient of any filled or excavated Complies with the Probable Solution – The proposed
O1 Finished surface levels ensure land is free draining. area is within the range 0.5% to 1.5% and drains to Council’s development includes an overall grade of the site of between
stormwater infrastructure where available or where 0.5% and 1.5%. All retained stormwater and drainage will be
stormwater infrastructure is not available, toward the street. appropriately treated and transferred to the legal point of
discharge.
Hydraulics No solution provided. Complies with the Specific Outcome – The proposed
O2 Any change to the level of the land does not have an development will not cause any flooding impacts or impact on
July 2016 Page | 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.