MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
Haulage activity and amenity No solution provided Complies with the Specific Outcome – During construction
O7 Haulage of material to and from a site ensures— all haulage of construction materials will be completed in
a) minimal disturbance to neighbouring properties and accordance with a construction management plan. This will
properties along the haulage route; and ensure there will be not tracking of sediment onto Council’s
b) Council’s road infrastructure including pavements is not road network.
adversely affected.
O8 Extent of earthworks S8.1 All earthworks, including cut and fill batters, retaining Complies with the Possible Solutions – All earthworks
Earthworks are contained within the subject property. walls etc are contained within the subject site. have been contained within the site boundaries. Council is
directed to Appendix B – Architectural Plans for further
details.
Sloping sites S9.1 Cut or fill is less than 2m in depth relative to the natural N/A – the subject site is not considered to be sloping.
O9 On sloping sites, excavation or filling are designed to ground surface.
maximise the use of natural slope and minimise the need for
cut and fill.
Environmental protection No solution provided. Complies with the Specific Outcome – The proposed
O10 Earthworks minimise any adverse impact upon development has included earthworks for the construction of
groundwater, watercourses, drainage lines, wetlands, and the basement parking level. The proposed earthworks are
native vegetation. considered minor in scale and wil not create any adverse
impacts on the groundwater, watercourse or drainage lines.
Council is directed to Appendix B – Architectural Plans for
further details.
Dams S11.1 Where the site is in the Rural Zone— N/A – The site is not in proximity to a Dam.
O11 Dam location and construction does not impact upon a) the land has a slope of less than 25% (1:4); and
neighbouring properties in terms of— b) the earthworks including cut and fill batters and retaining
a) hydrology; walls are setback a minimum of 50m from the property
b) alteration of existing overland flowpaths and patterns; boundary; and
c) landslide or failure of dam wall; and c) the size of the lot is greater than 5 Hectares;
d) effluent disposal areas. AND
S11.2 Where the site is in the Rural Settlement Zone or the
Rural Zone where the lot is less than 5 Hectares—
a) the land has a slope of less than 1:6; and
b) the earthworks including cut and fill batters and retaining
walls are setback a minimum of 20m from the property
boundary; and
c) involving less than 500m3 of material;
AND
S11.3 For all other zones—
No solution provided.
July 2016 Page | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.