MCU16/0079 Town Planning Report

of 64

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                        Town Planning Report
                                                                                                                                                                               “Undefined Use”
                                                                                                                                          Staged Extension & Refurbishment of Existing RSL Club
                                                                                                                                                            5 Memorial Ave, Tewantin QLD 4565
                                                                                                                                                       Lot 3 on T16319 and Lot 10 on SP273411

Erosion and Sediment Control Code (Division 15)

                                                              Table 14-53 —Erosion and sediment control
                        Column 1                                          Column 2
                                                                                                                                              Compliance
                    Specific Outcomes                      Probable solutions (if code assessable)
14.125 Effects of works
Erosion and sediment control                        S1.1 Site disturbance is limited to building areas, their    Complies with the Probable Solutions – During the construction of
O1 Development minimises erosion and transport of   surrounds and other use areas;                               the development, where possible site disturbance will be limited to the
sediments off-site.                                 AND                                                          staged development area. During constriction, appropriate sediment
                                                    S1.2 Sediment barriers are provided throughout and           and erosion control measures will be implemented to reduce any
                                                    downslope of disturbed areas to prevent sediment             sediment tracking to the road and reduce dust nuisance.
                                                    washing into gutters, drains and watercourses either on
                                                    or off the site;
                                                    AND
                                                    S1.3 All stockpiles including sand, soil or building
                                                    materials are within the premises and contained within
                                                    individual sediment barriers;
                                                    AND
                                                    S1.4 Sediment basins are provided where the site
                                                    contains fine or dispersive soils;
                                                    OR
                                                    S1.5 A stormwater catchpit incorporating a stormwater
                                                    catchpit protection device is installed so that all runoff
                                                    from disturbed areas flows to the catchpit;
                                                    AND
                                                    S1.6 For buildings,
                                                    a) temporary or permanent downpipes are connected to
                                                    the stormwater system before laying the roof; or
                                                    b) localised erosion is avoided by directing flow from
                                                    downpipes over non-erosive areas.
Stormwater runoff                                   S2.1 Diversion drains or bunds are designed and              Complies with the Probable Solution – During the process of
O2 Stormwater is diverted around disturbed areas.   constructed to drain upstream run-off around the             construction for all stages, the proposed development will include
                                                    disturbed site; AND                                          diversion drains or bunds to drain run-off. The development will also
                                                    S2.2 Discharge from the diversion drains do not cause        ensure discharge from the diversion drains do not cause run-off
                                                    run-off impacts to other properties;                         impacts to other properties.
                                                    OR
                                                    S2.3 Alternative methods, as described in the Institution
                                                    of Engineers Australia (Queensland Division) Soil


July 2016                                                                                                 Page | 36

Log in to download the original (MCU16_0079 Town Planning Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.