Original source · versioned page text
MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
putrescibles.
Water Sensitive Design Code (Division 20)
Table 14-61
column 1 column 2
Compliance
Specific Outcomes Probable solutions (if code assessable)
Water reuse S1.1 Development complies with the water quality standards Complies – The proposed development
O1 Development uses a combination of detention and in Table 2 of the SEQ Regional Plan Implementation
retention systems to capture run-off from areas on the site; Guideline No. 7 for Water Sensitive Urban Design;
AND S2.1 No solution provided
O2 Water storage devices must have sufficient capacity S3.1 Captured water is plumbed to be available for all
having regard to local rainfall pattern and the catchment area external uses including gardening, irrigation, ponds, filling
of roof or other hard standing surface; swimming pools and outdoor cleaning, as well as all ground
AND
floor toilet cisterns and washing machine cold taps;
O3 Captured water is utilised for all non-potable uses on site;
AND
AND
S3.2 Where the captured water is used for toilet flushing
O4 On-site detention does not adversely impact on water
and/or laundry use, an automatic or manual interchange
requirements downstream of the site where the water is
device that allows alternate use of captured water or the
required to sustain the ecology and hydrology of downstream
reticulated water supply is installed to ensure that there is a
systems (environmental flows);
continual supply of water for sanitary flushing and laundry
AND
use.
O5 Within the Shire Business Centre site, as shown on Map
S4.1 No solution provided
SBC, on-site detention measures are contained within the
S5.1 No solution provided
developed areas of the site, clear of drainage lines and Open
Space Precincts.
Run-off treatment S6.1 & S7.1 Development complies with the water quality Complies – All stormwater and drainage from the site will be
O6 Run-off that leaves the site is treated so as not to standards in Table 2 of the SEQ Regional Plan adequate treated prior to discharge. This will be in
adversely impact on the ecology and hydrology of Implementation Guideline No. 7 for Water Sensitive Urban accordance with the SEQ Regional Plan.
downstream environmental flows; Design.
AND
O7 Within the Shire Business Centre site, as shown on Map
SBC—
a) run-off treatment occurs within the site ; and
b) drainage lines are only used for final polishing of run-off.
July 2016 Page | 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.