MCU16/0079 Town Planning Report

of 64

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                  Town Planning Report
                                                                                                                                                                                         “Undefined Use”
                                                                                                                                                    Staged Extension & Refurbishment of Existing RSL Club
                                                                                                                                                                      5 Memorial Ave, Tewantin QLD 4565
                                                                                                                                                                 Lot 3 on T16319 and Lot 10 on SP273411

Town water supply connections                                   S8.1 A suitable backflow prevention device is installed to         Complies – The proposed development has incorporated
O8 Backflow devices or similar systems ensure water reuse       protect the potable water within the reticulated water supply in   backflow devices on all water supply connections were
facilities have no impact on the quality of the town mains      accordance with AS/NZS 3500:2003 Plumbing and Drainage.            possible. All connections have been designed in accordance
water.                                                                                                                             with the Australian standards.
Use of natural treatments and systems                           S9.1 & S10.1 Development complies with the water quality           Complies – The proposed development has been designed
O9 Natural treatment strategies, including grass swales and     standards in Table 2 of the SEQ Regional Plan                      in accordance with the SEQ regional Plan. All stormwater and
bio-retention systems, vegetated filtration strips and gross    Implementation Guideline No. 7 for Water Sensitive Urban           drainage from the site will be treated onsite prior to transfer to
pollutant traps, are used wherever practicable;                 Design.                                                            the legal point of discharge. Where possible natural treatment
AND                                                                                                                                strategies will be incorporated into the development.
O10 Within the Shire Business Centre, as shown on Map
SBC— where necessary, drainage lines are ecologically
enhanced to ensure that the water quality polishing functions
are of high standard.




Water Supply and Sewerage Reticulation Code (Division 21)

Table 14-62 Water supply
                        Column 1                                                         Column 2
                                                                                                                                                             Compliance
                    Specific Outcomes                                     Probable solutions (if code assessable)
14.164 Design and construction (water)
O1 Water supply infrastructure—                                 S1.1 Water supply infrastructure is designed in accordance         Complies – The proposed water connections and water
a) meets the needs of the users;                                with PSP6 –Engineering Design Standards — Water and                supply infrastructure has been designed in accordance with
b) is designed to be compatible with existing infrastructure;   Sewerage and As Constructed data submitted in accordance           PSP6. All documentation will be provided during the
    and                                                         with PSP6 –Engineering Design Standards — Water and                Operational Works, Building and Plumbing application stage.
c) is designed using materials that are suitable for the use,   Sewerage.
    durable, easy to maintain and cost effective, taking into
    account the whole of life cycle cost and Council’s
    maintenance inventory.




July 2016                                                                                                        Page | 56

Log in to download the original (MCU16_0079 Town Planning Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.