Town water supply connections S8.1 A suitable backflow prevention device is installed to Complies – The proposed development has incorporated
O8 Backflow devices or similar systems ensure water reuse protect the potable water within the reticulated water supply in backflow devices on all water supply connections were
facilities have no impact on the quality of the town mains accordance with AS/NZS 3500:2003 Plumbing and Drainage. possible. All connections have been designed in accordance
water. with the Australian standards.
Use of natural treatments and systems S9.1 & S10.1 Development complies with the water quality Complies – The proposed development has been designed
O9 Natural treatment strategies, including grass swales and standards in Table 2 of the SEQ Regional Plan in accordance with the SEQ regional Plan. All stormwater and
bio-retention systems, vegetated filtration strips and gross Implementation Guideline No. 7 for Water Sensitive Urban drainage from the site will be treated onsite prior to transfer to
pollutant traps, are used wherever practicable; Design. the legal point of discharge. Where possible natural treatment
AND strategies will be incorporated into the development.
O10 Within the Shire Business Centre, as shown on Map
SBC— where necessary, drainage lines are ecologically
enhanced to ensure that the water quality polishing functions
are of high standard.
Water Supply and Sewerage Reticulation Code (Division 21)
Table 14-62 Water supply
Column 1 Column 2
Compliance
Specific Outcomes Probable solutions (if code assessable)
14.164 Design and construction (water)
O1 Water supply infrastructure— S1.1 Water supply infrastructure is designed in accordance Complies – The proposed water connections and water
a) meets the needs of the users; with PSP6 –Engineering Design Standards — Water and supply infrastructure has been designed in accordance with
b) is designed to be compatible with existing infrastructure; Sewerage and As Constructed data submitted in accordance PSP6. All documentation will be provided during the
and with PSP6 –Engineering Design Standards — Water and Operational Works, Building and Plumbing application stage.
c) is designed using materials that are suitable for the use, Sewerage.
durable, easy to maintain and cost effective, taking into
account the whole of life cycle cost and Council’s
maintenance inventory.
July 2016 Page | 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.