Reinforcement:
Reinforcement is to comply with the following :
a) Concrete cover around the reinforcement must be 40mm to unprotected ground, 40mm to external
exposure, 30mm to the membrane in contact with the ground, and 20mm to the internal surface. The
slab fabric shall be placed towards the top of the slab within the zone defined by these limits. We
recommend 30mm top cover.
b) Slab fabric must be lapped by one full panel of fabric so that the two outermost transverse wires of one
- sheet overlap two outermost transverse wires of the sheet being lapped. Slab fabric is to be supported on
bar chairs placed at 800mm ctrs. -
¢) Trench mesh must have ail cross wires cut flush with the outer main wires. Trench mesh in slab and
edge beams must be overlapped by the width of the fabric at “T” & “L” intersections. Trench mesh must
be spliced, where necessary, by a !ap of 500mm.
d) Pre-Fabricated footing cages or reinforcing bars at “T” & “L” intersections are to have a Y12 comer
lapping bar top and bottom and lapped 500mm with adjacent bars.
e) The minimum fap length of reinforcing bar is to be 500mm or 25 bar diameters, whichever greater.
7.0 ARTICULATION REQUIREMENTS:
The specifications in this report have been specifically formulated for articulated masonry construction.
This usually results tower construction costs. All masonry walis must have full height articulation at a
maximum spacing of 8 meters. The articulation joint must separate the masonry from footing to eaves
fevel at this spacing. Masonry must be supported on each side of the joint in an approved manner to
retain its structural integrity. : ;
Where used, internal masonry walis should be articulated in accordance with the masonry manufacturers
requirements for the width and type of unit used. In no instance should the spacing exceed 4.0m and
articulation should always be provided at an abutment with an external wall.
If articulation of masonry is found to be unacceptable, the footing system will require re-designing.
in addition to joints in masonry, articulation is achieved wherever a 40mm (min) separation in masonry
from footings to eaves is achieved. For example, where timber panels are used above and / or below
doors and windows.
_ Where it is necessary to construct construction joints to meet the articulation requirements, they can be
placed in places of limited visibility. For example behind downpipes. Internal masonry walls should be
articulated where they abut the perimeter walls.
The designer of the building must also ensure that articulation is established: .
1, Adjacent to a change in floor level which exceeds 400 mm.
2. if any proposed extension abuts any existing structure, full height articulation must be established
where the new masonry joins the old.
3. Where a masonry wall transgresses from one footing type to another - e.g. from a perimeter
footing to a continuous footing.
If the building has any masonry arches we must be contacted for further advice.
Methods of articulation are well documented in “Technical Note 61” by the Cement & Concrete
Association.
$CG CONSULTING ENGINEERS 5 SCG Ref: 16078(S)See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015CE08.001.pdfRelated documentPublic source context ↗
06/1101 - Application for Op Works 18 Weyba St [As Published]Related documentApplication case desk ↗
About this file
- File size
- 702 KB (small file)
- File type
No other editions are linked here.