:              8.0     LIMITATIONS: |
               Field Testing Limitations       The soil profiles reported in our Log Section should be representative of
               the soil conditions over this site. In some cases soil conditions may change dramatically over short
               distances, therefore exploration programs may not locate all variations. If site excavations reveal soil
               conditions that are different from those shown in the attached log sections we must be immediately
                notified. Changes to the site classification and/or footing design may be necessary.
                Previous Excavations The recommendations contained in this report have not taken into consideration
               the long term effects of any previous, current or potential subsurface excavation mining or potential slope
                instability problems. {f a slope stability assessment is required for this allotment we can arrange for this to
                be done, but that type of report is beyond the scope of our commission and fees in this report.
                Client Supplied Information In writing this report we have considered all the information supplied to us
                by the client. Should the client or his agent have omitted to supply us with relevant information our report
                may be irrelevant and / or inappropriate. We do not take responsibility for the consequences in such
                cases and we will make an additional charge if as a result, more testing or re-writing of the report is
                necessaly.
                General Recommendations for Builders/Owners:          :
                Underground Services      —__ Where structures are built over uncontrolled fill, services will need to be
                supported so that settlement of this fill does not cause them damage or cause incorrect alignment.
                ‘Plumbing       Arrange plumbing fixtures so that the slab and beam penetrations are kept to a minimum
                and where necessary sleeved to allow for movement with 40mm thick closed cell polythene or similar
                material. Where the penetration is within 150mm of the base of a beam or footing, the depth of this
                footing element should be deepened by approximately twice the diameter of the penetration. All plumbing
                and drainage must comply with the requirements of the Nationa! Plumbing and Drainage Cade.
                Drainage        The ground surrounding the building site must be graded and drained so that water is
                shed away from the house area in all directions. Particular attention should be given to ail drainage and
                plumbing trenches so that they do not introduce water to the foundation soil, and destabilise the footings.
                Correct drainage is an essential part of our recommendations and design.     If the site is not prepared
                correctly, excessive soit moisture may accumulate in some areas, which may lead to wall and/or floor
                 movements. Roof water should be diverted away for the building as soon as the roof is installed. Where
                 building delays occur, temporary downpipes may be necessary.
                 Bracing for Wind Forces        Untess noted, we do not detail slab thickenings or pad footings to
     .           conform to wind bracing. Where a bracing wall is to be bolted to a slab, 40mm bottom concrete cover
                 attained for a radius of 150mm is required around the bolts unless noted by other consultants.
                 inspections:
                 We require 24 hours notice if you require engineers site inspections. Inspections can be booked between
                 8.30am and 4.30pm Monday to Friday by telephoning 07 5447 5544.
                 Site Classification: The site classification is calculated in accordance with the “AS2870-1996 Residential
                 slabs and footings-Construction” and relates to the estimation of Ys, “The characteristic surface
                 movement” within reactive soil profiles. The limits used for this classification are as follows;
                                           Predicted Surface Movement
                                        (Ys=<s2omm SSs*~—C~d SS SSSigt
                                         PYs=>20-40mm TM                           Moderate
                                         r¥s=>40-7omm SSC TH                     CHigh
                                          Problem sites                     P      Problem

                  $CG CONSULTING ENGINEERS                          6                                   SCG Ref: 16078(S)

Used in these records

About this file

File size
702 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015CE08.001.pdf · 702 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.