SPECIAL MEETING AGENDA                                                         16 DECEMBER 2019


5.      Access during construction

The Gympie Terrace project will cause disruption to traffic and pedestrian movements on and
around Gympie Terrace during the life of the project. Specific requirements have been placed on
the contractor to communicate with, and ensure access to businesses and residences is
maintained throughout the project.

Through traffic will be maintained for the duration of work, however motorists will be encouraged
to use alternate routes as delays are expected. Night works are proposed for critical elements of
the road crossing work to further minimise traffic flow and access restrictions. This night work will
be structured such that impacts to adjacent land uses is minimised.

The contractor must also consider the impact of work to community events and take appropriate
action to mitigate any impact. To assist this, the contractor will be provided with a copy of the event
calendar.

6.      Program

The preferred contractor has nominated a construction period of 4 months commencing in
February 2020 subject to favourable conditions during construction. It is proposed that night work
be undertaken for critical road crossing work to provide an accelerated works program.

7.      Previous Council Consideration
Nil.

8.      Finance
A combined budget allocation of $1,964,000 has been provided in the 2019/2020 budget.

This combined work allocation is comprised of $1,200,000 Council funding for stormwater renewal,
$632,000 Council funding and $132,000 State Government funding for corridor renewal works.

The below table identifies the estimated project costs and total budget.

 Item                                                                      Cost (excl. GST)

 Costs to date (November 2019)                                                    $47,149.18
 Tendered Contract Value (ex. GST)                                            $1,728,405.83
 Consultant and staff costs                                                          $95,000
 SUB TOTAL                                                                    $1,870,555.01
 CONTINGENCY                                                                    $182,340.58
 TOTAL BUDGET                                                                 $2,052,895.59


A budget review submission will be required at BR3 to address a shortcoming of $88,896 if the full
value of contingency is required.




                                                                                       Page 15 of 25
Log in to download the original file

2019-12-16 Special Meeting Agenda(PDF, 2MB).pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.