Original source · versioned page text
2 Emerald Planning Report
MCU14/0091 This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Site Access and Driveways 16. A sealed access driveway must be provided from Wimmers Lane to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular extension of the existing formation to the property boundary to provide a suitable access to the carparking area. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Car Parking 17. A minimum of 23 car parking spaces must be provided and marked on the site and made available and accessible at all times while the use is open for business. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. 12 customer parking spaces within the total, which are clearly marked for that purpose and accessible at all times for visitor use b. 11 staff parking spaces within the total, which are clearly marked for that purpose c. 1 disabled parking space within the total d. crossfalls, dimensions and gradients in accordance with Australian Standard AS2890: Parking Facilities. 18. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Bicycle Facilities 19. Six (6) bicycle parking spaces and 3 lockers must be provided for the development. Stormwater Drainage 20. All stormwater drainage must be collected and discharged so there is no net increase in stormwater runoff from the site. 21. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawing number 1501-02B prepared by Callaghan and Toth dated March 2015. Undergrounding of Existing Overhead Powerlines 22. The existing overhead electricity reticulation connection to the site must be removed and any new connection must be provided underground. Easements 23. A 1.5 metre wide easement for “Public Thoroughfare” purposes must be registered against the title of the property in favour of Council. The easement must be located directly adjacent to the Wimmers Lane frontage. The easement must: a. be clearly shown on all plans submitted for Operational Works Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.