2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009
particular a driveway crossover in accordance with IPWEAQ standard drawing SEQ
R-056.
New Roads
21. The new roads shown on the Approved Plans must be constructed in accordance
with the conditions of this Decision Notice and dedicated as road reserve at no cost to
Council.
22. A temporary turnaround facility must be constructed at the end of each road left
temporarily incomplete as a result of the development staging. The temporary
turnaround facilities must be in accordance with an Operational Works approval and
must be of sufficient size to accommodate the 3-point turn manoeuvre of a Waste
Collection Vehicle (WCV).
23. New roads as shown on the Approved Plans must be constructed. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
(a) Stage 1:
(i) 6 metre wide kerb to kerb formation within a 20 metre wide road
reserve;
(ii) sealing, kerbing and channelling (flush kerb may be used where
applicable);
(iii) a cul-de-sac turnaround area with a minimum 9 metre radius and
minimum 4 metre wide verge at any point on the turning circle; and
(iv) installation of street lighting where necessary.
These works must be completed prior to the sealing of the Survey Plan for
Stage 1.
(b) Stage 2:
(i) 6 metre wide kerb to kerb formation within a 20 metre wide road
reserve;
(ii) a cul-de-sac turnaround area with a minimum 9 metre radius and a
minimum 4 metre wide verge at any point on the turning circle
(iii) sealing, kerbing and channelling (flush kerb may be used where
applicable);
(iv) a temporary turnaround facility must be constructed adjacent to the
to the northern boundary of Lot 38;. The temporary turnaround
facility must be in accordance with an Operational Works approval
and must be of sufficient size to accommodate the 3-point turn
manoeuvre of a Waste Collection Vehicle (WCV); and
(v) installation of street lighting where necessary.
These works must be completed prior to the sealing of the Survey Plan for
Stage 2.
(c) Stage 3:
(i) All roads – 6 metre wide kerb to kerb formation within a 20 metre
wide road reserve;
(ii) cul-de-sac turnaround areas with a minimum 9 metre radius and a
minimum 4 metre wide verge at any point on the turning circle; and
(iii) installation of street lighting where necessary.
These works must be completed prior to the sealing of the Survey Plan for
Stage 3.
Access Easement
24. The access driveway within the access easement within Lot 52 as shown on the
Approved Plans must be constructed. The works must be undertaken in accordance
with an Operational Works approval and must be:
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.