Car Parking
23. Parking located along the emergency access route within Lots 11-15 must be limited to the
individual lot. The easement documents for the emergency access route must include
sufficient detail to limit the movement of vehicles and parking to the individual lot and clear
of the emergency access route.
Pedestrian and Bicycle Facilities
24. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. the on-road bicycle lanes as shown on the approved plans,
b. the footpath network as shown on the approved plans,
c. the footpath within proposed Lots 3 and 4, being Easement Al and Easement AO, must
be constructed as part of the subsequent development of Lots 3 and 4. The pathway
is to extend from the Hofmann Drive frontage to the common boundary between Lots
3 and 24. The works must be undertaken in accordance with an operational works
approval and include a 3m wide sealed surface, drainage d suitable lighting for
pedestrian safety (CPTED). Despite condition 1, the timing for the construction of the
pathway is at the time of the subsequent development of Lots 3 and 4.
d. the footpath on the northern side of Hofmann Drive must be extended from the crossing
point adjacent to Lot 4 to the north west for the full frontage of Covenant J
e. all footpaths and associated infrastructure located within private property must be
maintained by the property owner
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
25. All stormwater drainage infrastructure must be located outside of the open space covenants
unless approved as part of an Operational Works application.
26. As part of any future Material Change of Use application for proposed Lot 4, 5 or 6, a
Stormwater Management Plan is to be provided and stormwater quality treatment devices
are to be incorporated into the site layout such that the pollutant load reduction targets
specified in Appendix 2, Table B of the State Planning Policy 2017 are achieved (refer
property note)
27. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2012), and must include in particular
stormwater quality treatment devices of a size and location generally in accordance with
those shown in the Site-based Stormwater Management Plan – Version 5, prepared by
Barlow Shelley Consulting Engineers Pty Ltd, dated 2nd December 2019. The bio retention
devices are required to treat runoff from the bushfire access and carparks within Lots 12-15.
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval in compliance with the relevant sections of Queensland Urban Drainage Manual.
29. Stormwater runoff from the development must be controlled and disposed of into a lawful
point of discharge and in a manner that does not cause scour or damage to the subject site
or any adjoining property including Council’s drainage system.
30. Any drainage line or stormwater outlet located within the adjoining vegetation covenant or
easement area must be aligned to minimise the impacts on existing vegetation with the final
alignment determined on-site in agreement with Council’s delegate.
Page 6 of 18
Document Set ID: 24498083
Version: 5, Version Date: 02/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - RAL18/0023 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 432 KB (small file)
- File type
No other editions are linked here.