GENERAL COMMITTEE MEETING 18 MARCH 2019
64.2.2 Incorporate a coarse sediment forebay (in addition to the required
filter media surface area), which is sized in accordance with the
latest version of the Water Sensitive Urban Design Technical
Design Guidelines for South East Queensland and designed
generally in accordance with IPWEQA Standard Drawing No.
WSUD-005.
64.2.3 Have safe, unobstructed and all weather access from the road
frontage for maintenance purposes, particularly for the coarse
sediment forebay.
64.2.4 Are provided with a high flow bypass to ensure that flows which
exceed the treatment capacity of the device are bypassed in order
to avoid damaging of the filter media or subjecting the filter media
to excessive sediment loads.
64.2.5 Are provided with a free-draining outlet from the sub-soil
drainage system.
65. All stormwater quality treatment devices must be maintained in accordance with
a Maintenance Manual prepared for the development by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works. The Maintenance Manual must include:
65.1 A plan showing the location of the individual components of the system
65.2 For proprietary products the manufacturer’s data and product information
sheets
65.2.1 For bioretention basins reference to the Water By Design
Maintaining Vegetated Stormwater Assets and Rectifying
vegetated stormwater assets
65.3. Location of inspection and monitoring points shown clearly on the plan
65.4. A schedule or timetable for the proposed regular inspection, maintenance
and monitoring of the devices.
65.5 For proprietary products a maintenance contract of a minimum 10 years to
demonstrate that the proprietary product shall be maintained as per the
manufacturers specifications.
65.6 Details of the location and method for maintenance of any proprietary
products to demonstrate that collected pollutants and nutrients shall be
disposed of in accordance with relevant legislation.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
72. The fire-fighting demand on Unitywater’s water supply system from the
development must comply with Unitywater requirements and industry standards.
C. Delete conditions 44, 45 and 80.
D. Include the following new condition
1. Any proprietary stormwater quality improvement device included to achieve the
required stormwater quality Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan, must demonstrate only be granted an
Operational Works Approval on the following provisions:
Page 8 of 12