ORDINARY MEETING MINUTES                                                  17 OCTOBER 2024


                                       $1.64 million Growing
                                       Regions         Program,
                                       Australian Government
             Noosa Cycling $250k       $9.3m Noosa Parade (stg                $250k     has
             and    Walking            1) Construction                        resulted     in
             Strategy                  $100k     High    Priority             $11.3 million
                                       Corridor Route Study                   which       45
                                                                              times      the
                                       $152k     Noosa    Drive
                                                                              original
                                       Design                                 investment.
                                       $150k Noosa Parade
                                       Stage 2 Design
                                       $693k SEQCSP
                                       $880k SEQ Liveability
                                       Fund
                                       $30k Walking network
                                       plans - Noosaville &
                                       Cooroy
             Cooroy         $50k High $2.7m Gymnastics                      $50k        has
             Sporting       level      Upgrade & Multi-purpose              resulted       in
             Complex        masterplan area                                 $6.3     million
             Master Plan               $600k SEQCSP Lighting                which      126
                                               Upgrades                     times        the
                                               $3m+ Funding received by     original
                                               the sporting complex from investment.
                                               external providers
             Noosa    District   $50k High     $1m Facility upgrade, pickle $50k        has
             Sports Complex      level         ball courts, amenities       resulted in $4
             Master Plan         masterplan    $3m+ Funding received by million which
                                               the sporting complex from 80 times the
                                               external providers           original
                                                                            investment.


            QUESTION 2.
            The community rejected the Noosaville Foreshore Infrastructure Master Plan
            released in June 2024, and it had to be redrafted. How much will the redraft of the
            Noosaville Foreshore Infrastructure Master Plan cost?

            Response provided by Acting Director Infrastructure Services, Shaun Walsh
            Firstly, the community had differing reactions to the draft Noosaville Foreshore
            Infrastructure Master Plan. Many certainly did not appreciate the loss of
            carparking, overly modern design approach, concerns for the erosion
            management techniques as well as concerns for proposed changes to the tennis
            court and other spaces. Others in the community appreciated the widening of
            footpaths to make them safer, the new proposed toilet block, refreshed playground
            equipment and natural approach to Chaplin Park.

            The redrafting of the Master Plan is budgeted for an additional $209,401 including
            consultants, staff time and on costs. As noted above the Noosaville Foreshore is
            a large complex space, and the infrastructure master plan provides a valuable
            platform for grant infrastructure.

            Master Planning can be a difficult process to ensure appreciation of the issues and
            community consensus on the design direction moving forward. Council deeply
Log in to download the original file

9361a7194e.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.