Planning Report 60500
Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.
increasing flooding, which adversely S11.2 Where Council infrastructure
affects the safety or use of any land is available—
upstream and downstream; and iii. a) any drainage (from buildings
adversely affecting the flow of water and land) flows to that
in any overland flow path. infrastructure; and
b) the infrastructure has the
capacity to accept any additional
loading;
AND
S11.3 For Residential Uses—
a) where slab on ground
construction is used, filling does
not extend more than 1m beyond
the building footprint and access to
car parking areas, measured from
outer walls of the building; or
b) the design consists of a
suspended floor construction;
AND
S11.4 Car parking and
maneuvering areas are constructed
at a level that permits the parking
area to drain from the site by
gravity means, without the need
for mechanical pumping; or
S11.5 Basements for residential
uses have flood immunity above
the 1%AEP defined flood event
where alternative means to
mechanical pumping are used to
achieve such immunity; or
S11.6 Basements for non-
residential uses have flood
immunity above the 1%AEP
defined flood event that may be
achieved by means of mechanical
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.