Original source · versioned page text
Planning Report 60500
Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.
prevailing summer
breezes; and
d) minimise exposure to
prevailing winter winds.
14.189 Infrastructure
O15 Each lot is capable of being S15.1 All lots are connected to power supply Complies.
serviced by appropriate levels of— and telecommunications services;
The subject site’s urban
a) water supply; AND setting allows for the easy
b) reticulated sewerage; connection of urban
c) stormwater drainage;
services to all future
d) power supply; and
allotments within the
e) telecommunications;
subdivision. Particular
construction and design
O16 The design and provision of S16.1 For lots in urban settlements—power details will be addressed
public services and utilities, including supply and communications infrastructure are within the subsequent
sewerage, water, electricity, street provided underground; Operational Works stage.
lighting and telecommunication
services— OR
a) meets the needs of users; S16.2 For lots elsewhere—power supply and
b) ensures health, safety and communications infrastructure are provided
convenience of the community; underground unless—
c) protects the natural a) located in the Rural Zone or Rural
environmental values of the Settlement Zone and where not in a
site and surrounds, including Bushfire Hazard Area as defined on
visual amenity and native Overlay Maps OM1.4-OM9.4;
vegetation; b) new low voltage lines can be strung from
d) are cost effective over their life poles carrying existing high voltage lines;
cycle; or
e) minimises adverse impacts to c) no extensions to the existing reticulation
the environment (including the network is necessary; or
amenity of the local area) in the d) it is necessary to cross a body of water;
short and long term; and
AND
f) ensures that the existing
systems are upgraded or S16.3 Street lighting is provided in accordance
relocated to be capable of with Section 3.19 of PSP5 Engineering Design
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.