Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Planning Report 60500

Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     supporting the proposed               Standards – Roads, Drainage and Earthworks;
     development;
                                           AND
                                           S16.4 For lots not within a sewerage service
                                           area—the lot has sufficient area and other
                                           attributes to ensure sustainable on-site sewerage
                                                    39
                                           disposal ;


                                             Advisory note

                                             PSP24 – Effluent Disposal details
                                             requirements for the design and siting of
                                             effluent disposal systems where located
                                             outside a sewerage service area. Compliance
                                             with PSP24 will be considered as part of
                                             Council’s assessment of the plumbing and
                                             drainage application.


                                            S17.1 Components of the essential network
                                            infrastructure that are likely to fail or may result
                                            in contamination when inundated by flood
                                            water –
                                          a) comply with Table 13.12; or
                                          b) are designed and constructed to exclude water
                                          inundation or infiltration and resist hydrostatic and
O17 Essential network infrastructure
                                          hydrodynamic forces as a result of inundation.
(e.g. electricity, water supply,
sewerage and telecommunications)
maintains effective function during
and immediately after flood events.
Electricity supply infrastructure                                                                  Complies.

O18 Uses and works maintain a safe         S18.1 Building footprints are situated clear of         The proposed
distance from electrical infrastructure    any power easements on-site;                            development allows for
including substations, overhead
                                           AND                                                     the safe placement of
power lines, power poles and
                                                                                                   building footprints with
Log in to download the original file

Planning Report 60500.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.