Original source · versioned page text
Planning Report 60500
Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.
supporting the proposed Standards – Roads, Drainage and Earthworks;
development;
AND
S16.4 For lots not within a sewerage service
area—the lot has sufficient area and other
attributes to ensure sustainable on-site sewerage
39
disposal ;
Advisory note
PSP24 – Effluent Disposal details
requirements for the design and siting of
effluent disposal systems where located
outside a sewerage service area. Compliance
with PSP24 will be considered as part of
Council’s assessment of the plumbing and
drainage application.
S17.1 Components of the essential network
infrastructure that are likely to fail or may result
in contamination when inundated by flood
water –
a) comply with Table 13.12; or
b) are designed and constructed to exclude water
inundation or infiltration and resist hydrostatic and
O17 Essential network infrastructure
hydrodynamic forces as a result of inundation.
(e.g. electricity, water supply,
sewerage and telecommunications)
maintains effective function during
and immediately after flood events.
Electricity supply infrastructure Complies.
O18 Uses and works maintain a safe S18.1 Building footprints are situated clear of The proposed
distance from electrical infrastructure any power easements on-site; development allows for
including substations, overhead
AND the safe placement of
power lines, power poles and
building footprints with
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.