Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Shire Council Coastal Hazard Adaptation Plan: Project                                                                                                12
Summary
Methodology

 Consequence     Community                                               Environment                       Council
                 Social                      Economic                                                      Financial              Other
                 of community affected or                                •   Environmental nuisance.       reduction in branch    sector or locally within the
                 activity/use experiences    Damage costs to non-        •   Containment required, minor   budget                 Noosa region.
                 minor disruption for a      Council owned critical          cleanup, no remediation
                 few weeks.                  infrastructure (excluding       required.                                            Potential for a limited
                                             private properties) less    •   Minor impacts on protected                           number of complaints
                                             than 25% of full                species or habitat, no                               resulting in negative
                                             replacement value.              recovery efforts required.                           attention from the public.
 Insignificant   Very small short term       Minimal or no repairs       Minimal very short term,          Recurrent reduction    Minimal or no impact to
                 disruption to               needed to a very small      temporary effects on habitat or   in Council operating   assets, which can be dealt
                 community’s services        number of properties with   species with recovery assured.    budget of <$100k       with through routine
                 (including to private       minimal repair costs.                                         or one of loss of      maintenance.
                 owned critical                                                                            less than $250K or     Minimal or no impact to a
                 infrastructure),                                                                          <1% recurrent          single business within the
                                             Damage costs to non-
                 wellbeing, finances or                                                                    reduction in branch    Noosa region.
                                             Council owned critical
                 culture (e.g. up to 5% of                                                                 budget
                                             infrastructure (excluding
                 community affected or
                                             private properties) less                                                             Zero or a few complaints
                 activity/use experiences
                                             than 5% of full asset                                                                resulting in negative
                 minor disruption for a
                                             replacement value.                                                                   attention from the public.
                 few weeks.
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.