Table 3 Pre Development Peak Flow Rates
ARI (Years) Rational Method (m3/s) XPStorm (m3/s) Difference (m3/s) Difference (%)
Q1 0.051 0.047 - 0.004 - 8%
Q2 0.069 0.079 + 0.010 + 15%
Q5 0.095 0.112 + 0.017 + 18%
Q10 0.111 0.128 + 0.017 + 16%
Q20 0.132 0.150 + 0.018 + 14%
Q50 0.167 0.162 - 0.005 - 3%
Q100 0.191 0.180 - 0.011 - 6%
The order of magnitude of the XPStorm Model results correlate reasonably well for all intensity
events when compared with the rational method calculations. As such, the XPStorm Model is
considered to be satisfactory for this investigation.
3.4 POST DEVELOPMENT SCENARIO
Table 4 overleaf outlines the calculations, methodology and inputs used to undertake the post
development hydrologic modelling in XPStorm.
Ref: B16239CR002 - 5 - Stormwater Management Plan
Noosa Energy Centre - Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.