Original source · versioned page text
Annual Report 2023-24
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 71, section 1. The text section number identifies this passage in the reader.
Measure: Number of development applications decided within the statutory timeframe Measure: Number of plumbing aplications decided within the statutory timeframe
100%
100%
90%
90%
80% 80%
70%
70%
Domestic
60% sewered
60% MCU application
50%
50% RAL Domestic
40%
non-sewered
DBW application
40% 30%
Current agency
referral 20% Commercial
30% applications
Op works
10%
20%
Plan seal
0
10% Minor changes Jan/2024 Feb/2024 Mar/2024 Apr/2024 May/2024 Jun/2024
0
Jan/2024 Feb/2024 Mar/2024 Apr/2024 May/2024 Jun/2024 Commentary: Decision made within timeframes are relatively consistent with all Commercial Applications
decided within statutory timeframes except for May achieving 94%.
Commentary: Decisions made within timeframe are relatively consistent with all MCUs decided within statutory
140 timeframes except for May achieving 78%. 141
Our Finances
Measure: Number of plumbing applications decided Measure: Investment return 0.25% above benchmark (UBS Bank Bill index)
Purpose: Performance of invested ratepayer funds
25
20 Domestic 1.6%
sewered
application
15 1.4%
Domestic
non-sewered 1.2%
10 application
1.0%
Commercial
5 applications
0.8%
0 0.6%
Jan/2024 Feb/2024 Mar/2024 Apr/2024 May/2024 Jun/2024 2023/24
0.4%
Noosa Council Annual Report 23/24
Commentary: Plumbing applications within the shire have increased over the past two years. 0.2%
2022/23
- The increase in plumbing applications for the year 2023 to 2024 has been around 7%
0% 2021/22
- Increases in plumbing applications this year are estimated break down is: July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
1/ Non-sewered plumbing applications increase of around 5%
2/ Commercial plumbing applications increase of 3% Commentary: Interest rates and long-term bond rates are stable but may start to decline with inflationary
3/ Slight increase in domestic application increase of around 0.9% pressures. Council has invested surplus cash into higher yielding term deposits to maximise returns on its
Council records indicate an increase in plumbing application activity of around 8%, this increase in part could cash holdings. Council has consistently achieved returns above target (0.25% above the Bloomberg bond
be contributed to Councils audit and compliance programme activities. rate June 2024: 4.36%).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.