GENERAL COMMITTEE MEETING AGENDA 14 NOVEMBER 2016
Page 22 of 30
GENERAL COMMITTEE MEETING AGENDA 14 NOVEMBER 2016
Budget Review 2 - September Quarter Review 2016/17
Summary of Submissions Received $ 9,336,947.09 $ 470,315.70 -$ 1,571,265.23 $ 7,765,681.86
(eile) Cost Centre / Project Description 2016/17 Current 2016/17 Actuals Proposed Pl oF Oe ei 7) Comments
= ITT [eld Adjustment Proposed
Revised Budget
CAP025 Botanic Gardens, Shade Stucture Renewal $o $ - $28,000.00 $28,000.00 Parks & Playgrounds Design phase for Botanical Gardens Shade House replacement.
Project
CAP026 Noosa Heads Park Road, Boardwalk Design $30,000 $ 31,729 $60,000.00 $90,000.00 Pathways & Enabling Facilities | This project is being consolidated with previous year project
and Consultation numbers for the same project.
CAP027 Noosaville Eenie Creek Road Off-Ramp to $123,043 $ 543 -$122,500.00 $543.09 Pathways & Enabling Facilities This project was reviewed and was deferred given other capital
Underpass Design renewal priorities
CAP028 Noosa Heads, Park Road Boardwalk $1,500,000 $ - -$473,000.00 $1,027,000.00 Pathways & Enabling Facilities | This project is being consolidated with previous year project
| Construction numbers for the same project.
CAP029 Munna Crescent Boardwalk Renewal $0 $ 32,591 $33,389.00 $33,389.00 Pathways & Enabling Facilities Emergent works request to rectify a damaged retaining wall and
boardwalk at Munna Park.
CAP030 Tewantin Cranks Park Pathway Renewals so $ - $13,200.00 $13,200.00 Pathways & Enabling Facilities | 66m of concrete pathway renewal to remove trip hazards and ensure
public safety.
CAP031 Noosa Heads Pinaroo Park Pathway Renewals $o $ - $16,700.00 $16,700.00 Pathways & Enabling Facilities 76m of concrete pathway renewal to remove trip hazards and ensure
public safety.
CAP032 Noosaville Wallace Park Pathway Renewals $0 $ - $17,500.00 $17,500.00 Pathways & Enabling Facilities | 78m of concrete pathway renewal to remove trip hazards and ensure
public safety.
‘CAP033 Peregian Beach David Low Way Raised $0 $ - $80,000.00 $80,000.00 Pathways & Enabling Facilities | To upgrade pedestrian crossing facilities on David Low Way, north of
Pedestrian Crossing Herron Street, to facilitate pedestrian movements between the
shopping centre and Rufous Street, Rufous Lane and the proposed
Digital Hub Building
CAP034 Botanic Gardens Pathway Replacement $o $ - $129,075.00 $129,075.00 Pathways & Enabling Facilities | This project is to remove or replace the worst (highest risk) pathways
at the Botanical Gardens with asphalt. This includes total pathway
lengths of 1,020 metres and a width of 2.5 or 3 metres depending on
location.
CAP035 Noosaville, Lake Weyba Drive Bus Turnaround $200,000 $ - -$200,000.00 $0.00 Public Transport Infrastructure Little feedback has been received from Translink in progressing this
project - to be reconsidered in the 2017/18 capital program
CAP038 Cooroy-Belli Ck Road Slip Repair $o $ 1,301 $1,301.00 $1,301.00 Sealed Roads Network External project manager required to complete grant acquittal in
2016/17 financial year.
CAP039 Cootharaba - Dr Pages Road & Kinmond Creek $o $ 71,609 $91,608.77 $91,608.77 Sealed Roads Network Completion of culvert stabiliser and replacement. Purchase of land.
Rd - Construction
CAP040 Noosaville - Mary Street footpath, roadworks & $0 $ : $74,400.00 $74,400.00 Sealed Roads Network Renewal of footpath, minor road works and drainage improvements
drainage improvements as a result of replacing to a modern day equivalent.
CAP041 Girraween Sportsground Water Bore & Storage $25,000 $ 38,222 $55,000.00 $80,000.00 Sports Ground and Facilities Installation of bore and above ground water tanks to adrdess water
consumption challenges
CAP041 Girraween Sportsground Water Bore & Storage so $ - -$11,000.00 -($11,000.00) Sports Ground and Facilities Noosa Lions Football club commitment to fund irrigation components
of bore water project
CAP042 Whole of Shire - stormwater structures $250,000 $ - -$180,000.00 $70,000.00 Stormwater Drainage Budget transfer to Noosaville, Thomas Street & Gympie Terrace
| Culvert project
CAP043 Noosaville, Thomas Street & Gympie Terrace $350,000 $ 8,793 $180,000.00 $530,000.00 Stormwater Drainage Replacement of a section of stormwater drain from Thomas Street to
Culverts the Noosa River comprised of 1500m x 600mm box culverts which
are starting to fail due to saltwater corrosion.
CAP044 Tewantin Poinciana Ave Kerb & Channel so $ - $52,000.00 $52,000.00 Stormwater Drainage Renewal of 130m kerb and channel to ensure the new road surface
Renewal is able to settle without disturbance from future kerb and channel
maintenance works.
CAP045 Cootharaba, Kinmond Creek Road Sandy Creek $750,000 $ 84 $300,000.00 $1,050,000.00 Stormwater Drainage To reconstruct the old deteriorating helcoil culverts with new
Culvert concrete box culverts to achieve the current standard (1 in 5
| flooding) - the existing road will need to be reconstructed.
CAPO046 Cootharaba, Kinmond Creek Road Eastern $500,000 $ 343 $550,000.00 $1,050,000.00 Stormwater Drainage To reconstruct the old deteriorating helcoil culverts with new
Branch Culvert concrete box culverts to achieve the current standard (1 in 5
flooding) - the existing road will need to be reconstructed.
Page 22 of 30See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.