Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2020-01-13 General Committee Agenda

of 172

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                13 JANUARY 2020


    Connection of the new internal road to an east-west road north of the rugby league fields
      and clubhouse which will provide for a through road from the northern (McKinnon Drive)
      entrance of the complex to the Butler St entrance, maximising car parking across the
      complex and reducing vehicle congestion in peak times.
    Creation of an active precinct/hub that supports formal physical activity programming
      targeting inactive populations in the community, while providing opportunities for the
      residents to use the precinct for informal and self-directed physical activity participation.
    Installation of a cycle/pedestrian network through the complex that connects with existing
      off road and on-road pedestrian/cycle infrastructure external of the complex.
    Clubhouse upgrades to maximise female participation, community use and functionality
      while increasing efficient use of natural resources (including water harvesting, solar panels
      etc.)
    Relocation of the Noosa Navy Cadets and repurposing of the building to accommodate
      community sporting needs.
    Playing field upgrades and new infrastructure to improve functionality, including installation
      of lighting, scoreboards, improvements to irrigation and drainage.

6    Community Consultation
In addition to the targeted stakeholder consultation detailed in section 2 of this report, general
community consultation on the Draft Noosa District Sports Complex Master Plan was conducted
through Council’s Your Say Noosa website from 27 November 2019 to 2 January 2020. No
formal submissions were received regarding the Noosa District Sports Complex. The user groups
at the site have reviewed the drafts and provided minor amendments to text in the draft Plan that
have been included in this final version.

7    Previous Council Consideration
Ordinary Meeting 21 November 2019, Item 3, Page 14
That Council note the report by the Community Development Officer (Sport and Recreation) to
the Services and Organisation Committee Meeting dated 12 November 2019 and:
A.    Approve the Draft Noosa District Sports Complex Master Plan included as Attachment 2 to
      the report, for the purpose of community consultation;
B.    Approve the Draft Cooroy Sports Complex Master Plan, included as Attachment 1 to the
      report, for the purpose of community consultation, subject to the following amendments:
      1      Page 29: Delete the section titled “Tenure” at the bottom of the page;
      2      Pages 39 – 40: Delete section 9 titled “Revised Tenure Plan” including the map on
             page 40; and
C.    Request the Chief Executive Officer to collate and consider the feedback for the purposes
      of developing final Master Plans for the future consideration of Council.

8         Finance
Funding of $50,000 for the development of the draft master plan was allocated in the 2018/19
and 2019/20 budgets. This has been predominantly used to engage the external consultants.
The Master Plan proposes a range of infrastructure changes and improvements which have
financial implications, preliminary costings have estimated this at $12.4 million across ten years.
The financial responsibility for these improvements will be shared between various stakeholders
including Council and the clubs at the complex. Sporting clubs typically rely on Master Plans as
an evidence-based starting point to access external grants and to lobby State and Federal
Governments for specific project funding. Once the final Master Plan has been adopted, the

                                                                                  Page 140 of 172
Log in to download the original file

2020-01-13 General Committee Agenda(PDF, 11MB).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.