Delegated Report - Code - Planning MCU20 0021 [As Published]
a. a new 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to Hilton Terrace. The path must be in accordance with Council’s standard
drawing RS-065 and any associated addendum
Condition 51 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
52. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with the drawing titled “Stormwater Management
plan” No. 30101-SW1.1 prepared by SCG Consulting Engineers dated May 2020, and must
include in particular:
a. extension of the site stormwater system to collect and convey ponded water from the
area of the site between the proposed retaining wall and the rear boundary.
b. the use of gravity stormwater drainage and not surcharge pits.
Condition 52 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
53. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
54. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
55. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
56. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
57. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
58. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
59. The Filling works required on site shall be carried out in accordance with Council’s
Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the
additional ponding of water on any adjoining lands or the blockage of, or interference with,
any natural watercourses.
60. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
61. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
Page 21 of 24
Document Set ID: 21107969
Version: 17, Version Date: 30/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.