ORDINARY MEETING MINUTES 18 DECEMBER 2014
Advisory Notes
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
obligations under the ACH Act.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
(if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified Persons
3. For the purpose of preparing a Rehabilitation Plan, a qualified person is
considered to be a landscape architect or ecologist with a minimum of 3 years
current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
This is not an official copy of Council’s Minutes
Page 26 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.