ORDINARY MEETING MINUTES 18 DECEMBER 2014
Site Access and Driveways
11. Sealed access driveways must be provided from Lake Macdonald Drive to all
parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with IPWEAQ standard
drawing SEQ R-051
b. a driveway width sufficient to cater for regular use by a HRV and the
occasional use by a semi-trailer (AV)
c. all damaged sections of the existing hardstand driveway must be
replaced with a suitable similar surface
Car Parking
12. A minimum of 64 car parking spaces must be provided and marked on the site.
The spaces must be available and accessible at all times while the use is open
for business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. 44 staff parking spaces within the total, which are clearly marked for that
purpose
b. 20 visitor/customer parking spaces within the total, which are clearly
marked for that purpose and accessible at all times for visitor/customer
use
c. 2 disabled parking space/s within the total
d. a sealed surface with crossfalls and gradients in accordance with
Australian Standard AS2890: Parking Facilities
13. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Bicycle Parking & End of Trip Facilities
14. Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must
be provided for the development. The facilities must be indicated on the plans
and submitted in accordance with an Operational Works approval and must
include in particular:
a. a total of 10 bicycle parking spaces
b. end of trip facilities involving a minimum of 5 lockers and 1 shower cubicle
with an ancillary change room.
Damage to Services and Assets
15. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
c. Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
This is not an official copy of Council’s Minutes
Page 39 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.