ORDINARY MEETING MINUTES 18 DECEMBER 2014
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, the Queensland Urban Drainage Manual and
Engineering report dated 3 September 2013 by Barlow Shelly Consulting
Engineers (with the works expanded to reflect the extended development area).
Stormwater Quality Management
17. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5.0 and 6.0 of the of the
Engineering report dated 3 September 2013 by Barlow Shelly Consulting
Engineers (with the works expanded to reflect the extended development
area)
b. swales which are designed in accordance with the Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland
c. The works must be undertaken in accordance with the Bioretention
Technical Design Guidelines (Water by Design, 2012)
18. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
1). The approved Operational Works drawings for the stormwater quality
treatment system and detailed life cycle costing of the system must be attached
as an addendum to this document. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
Stormwater Harvesting
19. Operating stormwater harvesting tanks must be provided for the development.
The tanks must be provided in accordance with an Operational Works approval
and must include in particular:
a. the details identified in section 5.0 and 6.0 of the of the Engineering report
dated 3 September 2013 by Barlow Shelly Consulting Engineers (with the
works expanded to reflect the extended development area).
LANDSCAPE & ECOLOGY
Landscaping Works
20. The development must be landscaped, in accordance an approval for
Operational Works. The particular works must generally accord with the
planning scheme Landscape Code and Planning Scheme Policy 3 Landscaping
Plants and Guidelines and include:
a. Landscaping to car park areas, including shade trees
b. Vegetated buffer to the Lake Macdonald Drive
c. Vegetated screening of any electrical transformers, bin storage areas and
the like from the road frontage
d. Details of any proposed clearing of vegetation and details of retention of
any existing trees on the site and road verge to accommodate the
approved development footprint. An Arborist Report is required to validate
any proposed clearing.
This is not an official copy of Council’s Minutes
Page 40 of 58