Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
e. Removal of all weeds species listed in the following standards and
legislation:
i. Declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. undesirable species, as defined within Planning Scheme Policy 3
Landscaping Plants and Guidelines of the Noosa Plan.
21. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques and irrigation that allow
for healthy, sustained and vigorous plant growth. All plant material must be
allowed to grow to full form and be refurbished when its life expectancy is
reached.
Rehabilitation
22. The land area defined by the vegetated portion contained within the Riparian
Buffer Area of the Biodiversity Overlay of the Noosa Plan on the subject must
be rehabilitated in accordance with a rehabilitation plan prepared by a suitably
qualified person and an approval for Operational Works. Rehabilitation works
must:
a. restore the habitat value of the land to meet the characteristics of the
appropriate regional ecosystem
b. return the land to its natural undisturbed state, where practicable. Where
impracticable, provide justification.
c. The treatment of undesirable species, as defined within Planning Scheme
Policy 3 Landscaping Plants and Guidelines of the Noosa Plan.
ENVIRONMENTAL HEALTH
Refuse Management
23. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is
required with a cold-water tap, hose and drain outlet connected to the effluent
disposal system, via a bucket trap. The drain outlet is to be designed to prevent
storm water entry to the effluent system and this can be achieved with a nib
wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
the waste area can be roofed, or any other design approved by Council’s
delegate.
24. The development must allow refuse-loading areas to be located off street. All
vehicles associated with the collection of waste/recyclables, shall enter and
leave the site in a forward direction.
25. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, shall be developed and implemented on site. The Waste
Management Plan must include the following as a minimum: -
The types and estimated volumes of waste that will be generated from the
activities approved within the development.
Methods to be used for dealing with garden waste.
Initiatives to minimise waste either by waste prevention, reduction, re-use
or recycling.
This is not an official copy of Council’s Minutes
Page 41 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.