74. The location of the ground water monitoring wells must be installed to maximize
the likelihood that the wells will intercept contaminated ground water whatever
the ground water flow conditions.
75. The ground water monitoring wells must be:
a. installed and operational before use of the UPSS commences
b. sealed to exclude surface water, clearly marked to indicate their presence
and properly secured
76. The ground water in the monitoring wells must be tested for petroleum
contaminants immediately after either:
a. the discovery whether by routine test or otherwise that ground water may
be contaminated by petroleum originating from the property
b. the discovery whether pursuant to the loss monitoring procedure for the
system or otherwise that the system has a leak
c. when requested by Council
De-commissioning of the UPSS
77. Where more than 2 years lapses since a tank were decommissioned, the UPSS
must be permanently removed in accordance with the relevant Australian
Standards and Workplace Health and Safety Qld requirements.
78. Certification must be provided to Council confirming the UPSS de-commissioning
was conducted by a suitably qualified and experienced person, and that removal,
transportation and disposal was in accordance with the Standards and
legislation.
79. At the time of abandonment of any UPSS the site must be investigated for
contamination. An assessment report must be prepared by a suitably qualified
and experienced person (as required under the Environmental Protection Act
1994) to verify the site has either met remediation criteria or is suitable for
continued and future use. The assessment report must be submitted to Council
no later than 60 days of either the:
a. decommissioning of an UPSS if no soil or ground water remediation is
required
b. completion of any remediation associated with the decommissioning of an
UPSS if remediation is required.
80. All records associated with the decommissioning of UPSS must be maintained
for a period of 7 years after removal of the UPSS. These records must be
provided to future owners/operators of the service station and property, as part
of ensuring all practicable measures have been implemented to prevent site
contamination.
Noise
81. Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
compressors, pumps etc. on site must be located within the building or suitably
provided with noise reduction measures and located to prevent a noise nuisance
beyond the boundary of the site and to not exceed the levels specified in Table
1.
Page 25 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.