Original source · versioned page text
2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
85. Where it is intended to use rainwater for drinking purposes, a suitable treatment
system is required to be installed to disinfect or treat the water to microbiological
and physical standards as described in the current Australian Drinking Water
Guidelines to make it fit for drinking purposes.
Compliance Certification Required for UPSS
86. Notwithstanding any other condition of this Decision Notice, a Certificate of
Compliance issued by a suitably qualified person* must be provided to Council
prior to commissioning the operation of the UPSS, that certifies the design,
installation, construction and operation of the underground petroleum storage
system (Service Station) complies in all respects with the conditions of this
Decision Notice and any relevant Australian Standards, Standard Test
Procedures and Codes referred to herein.
* A suitably qualified person is a Registered Professional Engineer of
Queensland with experience and knowledge in the design and operation of
the storage and dispensing of petroleum products and underground
petroleum storage systems.
Air
87. Offensive odours, dust, smoke, fumes, particulates, or other contaminants likely
to cause a nuisance must not be emitted beyond the boundaries of the premises.
88. Incineration or open burning is not permitted on the premises.
89. Offensive odours, dust, smoke, fumes, particulates, or other contaminants likely
to cause a nuisance must not be emitted beyond the boundaries of the premises.
90. When requested by Council, an Air Quality Assessment Report (AQAR)
characterising, monitoring and recording of nuisance emissions must be
undertaken to investigate any complaint (other than a frivolous or vexatious
complaint) caused by odours, dust, smoke, fumes, particulates or other
contaminants from operations at the premises.
91. Such monitoring must be undertaken within a reasonable and practicable
timeframe nominated by Council and be performed by a suitably qualified person
in accordance with relevant guidelines and Standards. The report must be
submitted to Council detailing the results of such monitoring and
recommendations for control measures to eliminate nuisance air emissions from
the operation of the premises.
Outdoor Lighting
92. Lighting associated with the use must be designed, sited, installed and tested to
comply with the Rubidium Light Cooroy Highway Service Station Lighting Plan
Environmental Mitigation report of 13 October 2016 and conditions of this
Decision Notice.
93. Certification must be submitted to Council from a qualified person which certifies
that all outdoor lighting devices comply with the report at the time of
commissioning.
Page 27 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.