GENERAL COMMITTEE MEETING 16 JANUARY 2017
11. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground
connection to reticulated water and sewerage has been provided to the
development site.
ENGINEERING
12. A minimum of 26 car parking spaces and 2 motor cycle spaces must be provided
on the site which includes 1 disabled space.
13. Bicycle parking spaces and end of trip facilities must be provided in accordance
with the approved plans.
14. All car parking areas and access driveways must be line marked and maintained
exclusively for vehicle parking and manoeuvring and kept in a tidy and safe
condition at all times.
15. Any awnings and/or other structures must not obstruct or impact on the function
of the loading zone.
Stormwater Drainage
16. Stormwater runoff from the development must be disposed of on-site generally
in accordance with the approved engineering plans without causing scour or
damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
17. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
Landscaping Works
18. The development site must be landscaped. The works must be undertaken in
accordance with the approved landscape plans and Planning Scheme Policy
PSP 3 Landscaping Plants and Guidelines.
19. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
ENVIRONMENTAL HEALTH
Noise
20. Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
compressors, pumps etc. must be situated within the building or suitably provided
with noise reduction measures and located as to prevent a noise nuisance
beyond the boundary of the site and not exceed the levels specified in Table 1.
Table 1
NOISE LIMITS AT A SENSITIVE RECEPTOR
(Excludes On-Site Ancillary Dwelling Unit – Caretakers Unit)
PERIOD Noise level at noise sensitive place measured as the
adjusted maximum sound pressure level (Lamax, adj,T)
7am – 6pm Background noise level (LAbg,T) plus 5 dB(A)
Page 3 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.