2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
g. Stormwater quality treatment devices must be routinely checked, serviced
and cleaned in accordance with the manufacturer’s recommendations or
Water by Design maintaining vegetated stormwater assets guidelines.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request. Where replacement cartridges or other
necessary components for the system become unavailable, an alternative
system is required to be retrofitted into the development to achieve an
equivalent pollutant reduction outcome.
h. All primary stormwater quality treatment devices must be routinely
checked, serviced and cleaned in accordance with the manufacturer’s
recommendations. Records of all maintenance activities undertaken must
be kept for 5 years and made available to Council upon request.
i. The ongoing maintenance plan for the development must include the
operations and maintenance manual for the water quality device/s and
must include the full cost of maintaining the system. This maintenance plan
must be provided as part of the subsequent operational works
j. The development must not cause an increase in peak flow runoff in 1, 5,
50 or 100 ARI events. The subsequent application for operational works
must include calculations and designs to demonstrate how this condition is
achieved.
k. That water quality objectives are met in keeping with the Environmental
Protection (Water) Policy 2009 for Mary River Environmental Values and
Water Quality Objectives.
Stormwater Harvesting
28. Operating rainwater collection tanks must be provided as identified in section 4.2
of the Stormwater Management Plan For Highway Service Centre Cooroy,
project number 161968 by Covey Associates, dated October 2016. The tanks
must be provided in accordance with a Building Works approval for above ground
tanks, or operational works approval for below ground tanks and provide for re-
use of harvested rainwater for internal non-potable uses and outdoor uses.
29. Prior to commencement of use, certification must be submitted to Council from a
qualified person* which certifies that the rainwater collection tank/s and
associated reticulation has/have been installed in accordance with the
requirements of this Decision Notice.
*(Refer to Advisory Note)
ENVIRONMENTAL HEALTH
Development Code – Hazardous Industry
30. The design, specifications and construction of the Manifest Quantity Workplace
(MQW) storage and dispensing of petroleum products (Service Station) is to
comply in all respects with the Model Development Code for Hazardous
Industries and Chemicals - Workplace Health and Safety Queensland(WHSQ)
Page 35 of 52