Skip to the record
Accept no imitations.

Original source · versioned page text

2017-01-16 General Committee Meeting Notes

of 52

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                       16 JANUARY 2017


              Waste Disposal
        26.   The developer must provide waste storage and disposal facilities in accordance
              with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
              Commercial and Industrial Premises”. The facilities must include an external
              impervious area correctly sized for all refuse and recycling containers and
              suitably screened from public places and neighbouring properties. A bin wash
              area is required with a cold-water tap, hose and drain outlet connected to sewer,
              via a bucket trap. The drain outlet must be designed to prevent storm water entry
              to the sewerage system. This can be achieved with a nib wall 50mm high and up
              to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be
              roofed, or any other design approved by Council.
        27.   Refuse containers must be provided in accordance with the requirements of the
              Environmental Protection (Interim Waste) Regulation 1996 and (Waste
              Management) Regulation 2000, for the storage and collection of refuse.
        OPERATIONAL WORKS – OPW16/0209
              Approved Plans
        1.    Development undertaken in accordance with this operational works approval
              must generally comply with the approved plans of development. The approved
              plans are listed in the following table unless otherwise amended by these
              conditions.
                Plan No.       Rev.   Plan/Document Name                                     Date
                02 of 04 -     K      Ground/Site Plan, prepared by Ace Space Design         25.10.16
                Project No:
                15.253
                26232      –          Operational Works: Earthworks & Retaining Wall Plan,   Aug 2016
                0W3                   prepared by SCG Consulting Engineers
                26232      –          Operational Works: Driveway & Access Plan, prepared    Aug 2016
                0W4                   by SCG Consulting Engineers
                LD 1           A      Specifications, prepared by Anembo Consultants         8.9.16
                LD 2           A      Details, prepared by Anembo Consultants                8.9.16
                LD 3           A      Schedules &      Legend,   prepared   by    Anembo     8.9.16
                                      Consultants
                LP 1           A      Landscape Plan, prepared by Anembo Consultants         8.9.16
                LP 5           A      Landscape Plan, prepared by Anembo Consultants         8.9.16

              Landscaping Works
        2.    Four (4) suitable native trees with a pot size of 45 litres must be planted evenly
              spaced to the garden adjoining the front boundary (between the entry and exit
              points).
        3.    All landscape works must be constructed and undertaken generally in
              accordance with the approved plans and conditions detailed in this Decision
              Notice.




                                                                                       Page 5 of 52
Log in to download the original file

2017-01-16 General Committee Meeting Notes(PDF, 939KB).pdf · 961 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.