GENERAL COMMITTEE MEETING 16 JANUARY 2017
10. Council must be contacted at least 5 working days prior to any works
commencing to organise a prestart meeting*. The contact number to arrange a
prestart meeting is 5329 6291. The prestart meeting must include the relevant
parties for the following aspects of the works:
a. Civil engineering works.
b. Landscape works.
c. Erosion and sediment control works.
* (Refer to Advisory Note)
11. Copies of the approved plans duly signed by the consultant Registered
Professional Engineer of Queensland (RPEQ) must be provided to Council’s
Engineering Officer Construction at the “prestart” meeting.
12. A detailed condition report including photographs of the frontage of the site and
the access driveway for construction must be completed and submitted to
Council prior to the prestart meeting.
13. A condition report including photographs of all fences and retaining walls
bordering the site and any buildings, structures, pathways, landscaping features
etc on adjoining properties that could potentially be impacted on by the proposed
earthworks and construction works must be completed and submitted to Council
prior to the prestart meeting.
14. A Construction Management Plan must be submitted to Council for approval prior
to the prestart meeting and must specifically include/address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures to be installed prior to
construction.
ii. Fencing to the work site during the construction phase to ensure the
safety of the public and the road users.
iii. Sufficient parking arrangements for trucks, machineries and
construction workers without adversely impacting on traffic
movements on the shared driveway on the access easement and/or
the public road.
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
c. Works programme identifying key components of the works and their
respective durations.
d. The proposed dates for the commencement and the completion of the
works.
e. Effective procedures and measures to minimise adverse environmental
impact on other properties and roads users including noise and dust
emission.
Page 7 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.