PO18 The Development will
Parking areas are designed to ensure No acceptable outcome provided Comply
drainage without the use of pumps or
other electrical apparatus.
PO19 AO19 The Development will
Site layout and building design Below ground components of buildings, including carparks, do Comply
provides for soft landscaping to be not extend beyond the above ground footprint to allow for the
established. provision of landscaping, particularly within building setbacks.
Table 9.2.4.3
Effects of Works
Drainage A Stormwater
PO1 AO1 management report has
Finished surface levels ensure Filled or excavated areas have a minimum gradient of been prepared
land is free draining. 0.5% and drain to Council’s stormwater infrastructure
where available, or where stormwater infrastructure is not
available, toward the street.
Hydraulics The Development will
PO2 Comply
Change to the levels on site do not No acceptable outcome provided
have an adverse impact on the
flooding and drainage
characteristics off-site.
Geotechnical considerations The Development will
PO3 AO3.1 Comply
Earthworks do not result in Filling works are undertaken in accordance with Council’s
geotechnical instability on-site or to Planning Scheme Policy PSP6 Engineering design
nearby premises. standards - roads, drainage and earthworks.
AO3.2
Where the filling is for residential, commercial or industrial
purposes the works comply with Australian Standard -
Guidelines for earthworks on commercial & residential
development.
Local amenity The Development will
PO4 AO4.1 Comply
Undertaking earthworks does not The following control measures are implemented—
adversely impact on the amenity of
the local area by way of dust, noise 1. regular water spraying of exposed areas to
or visual amenity. suppress dust;
2. provision of dust stabilised or sealed internal
roads;
3. protective covering of exposed areas that are
left for more than 2 weeks; and
4. unless a development permit provides
otherwise, disturbed areas are revegetated
using species identified in Council's Planning
Scheme Policy PSP2 Landscaping.
AO4.2
Earthworks are undertaken only during the hours of
7:00am to 6:00pm, Monday to Friday and 7:00am to
3:00pm on Saturday. No work is undertaken on Sunday or
public holidays.
Vegetative waste The Development will
PO5 AO5.1 Comply
Vegetation cleared from a Cleared vegetation is transported off-site for disposal in an
development site is disposed of in approved green waste disposal facility.
NMA_ECAR_19323
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.