                                         EDITOR’S NOTE—FURTHER DETAILS ARE PROVIDED IN
                                         THE Water Quality and Drainage Code.
PO18                                                                                                        The Development will
Parking areas are designed to ensure     No acceptable outcome provided                                     Comply
drainage without the use of pumps or
other electrical apparatus.
PO19                                     AO19                                                               The Development will
Site layout and building design          Below ground components of buildings, including carparks, do       Comply
provides for soft landscaping to be      not extend beyond the above ground footprint to allow for the
established.                             provision of landscaping, particularly within building setbacks.
Table 9.2.4.3
Effects of Works
Drainage                                                                                                    A Stormwater
PO1                                      AO1                                                                management report has
Finished surface levels ensure           Filled or excavated areas have a minimum gradient of               been prepared
land is free draining.                   0.5% and drain to Council’s stormwater infrastructure
                                         where available, or where stormwater infrastructure is not
                                         available, toward the street.
Hydraulics                                                                                                  The Development will
PO2                                                                                                         Comply
Change to the levels on site do not      No acceptable outcome provided
have an adverse impact on the
flooding and drainage
characteristics off-site.
Geotechnical considerations                                                                                 The Development will
PO3                                      AO3.1                                                              Comply
Earthworks do not result in              Filling works are undertaken in accordance with Council’s
geotechnical instability on-site or to   Planning Scheme Policy PSP6 Engineering design
nearby premises.                         standards - roads, drainage and earthworks.

                                         AO3.2
                                         Where the filling is for residential, commercial or industrial
                                         purposes the works comply with Australian Standard -
                                         Guidelines for earthworks on commercial & residential
                                         development.
Local amenity                                                                                               The Development will
PO4                                      AO4.1                                                              Comply
Undertaking earthworks does not          The following control measures are implemented—
adversely impact on the amenity of
the local area by way of dust, noise               1.   regular water spraying of exposed areas to
or visual amenity.                                      suppress dust;
                                                   2.   provision of dust stabilised or sealed internal
                                                        roads;
                                                   3.   protective covering of exposed areas that are
                                                        left for more than 2 weeks; and
                                                   4.   unless a development permit provides
                                                        otherwise, disturbed areas are revegetated
                                                        using species identified in Council's Planning
                                                        Scheme Policy PSP2 Landscaping.

                                         AO4.2
                                         Earthworks are undertaken only during the hours of
                                         7:00am to 6:00pm, Monday to Friday and 7:00am to
                                         3:00pm on Saturday. No work is undertaken on Sunday or
                                         public holidays.
Vegetative waste                                                                                            The Development will
PO5                                      AO5.1                                                              Comply
Vegetation cleared from a                Cleared vegetation is transported off-site for disposal in an
development site is disposed of in       approved green waste disposal facility.



         NMA_ECAR_19323
Log in to download the original file

Engineering Code Assessment Report.pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.