Engineering Code Assessment Report
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
an environmentally responsible AO5.2
manner. Cleared vegetation is mulched on-site and reused for
landscaping of the finished development.
AO5.3
Cleared vegetation is disposed of for the purpose of
firewood.
AO5.4
Disposal of vegetative waste by burning off is avoided.
Managing contamination risk The Development will
PO6 AO6.1 Comply
Materials used as fill are suitable Fill material is solid clean earth, free of putrescible or
for development and future use of refuse material, vegetation, acid sulfate soils, building or
the land and filling or excavation construction material or other material or contaminants.
works do not result in the
contamination of land. AO6.2
The site is not on the contaminated land register.
Haulage activity and amenity The Development will
PO7 Comply
Haulage of material to and from No acceptable outcome provided
a site ensures—
1. minimal disturbance
to neighbouring
properties and
properties along the
haulage route; and
Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks The Development will
PO8 AO8 Comply
The layout of the development All earthworks, including cut and fill batters, retaining walls
provides adequate, clearly defined and the like are contained within the subject site.
and easily accessible—
1. on-site vehicle
parking and
manoeuvring areas;
and
2. loading and
manoeuvring areas
for delivery and
service vehicles.
Sloping sites The Development will
PO9 AO9 Comply
On sloping sites development Cut or fill is less than 1.5 metres in depth relative to the
follows the natural landform natural ground level.
wherever practical and excavation
or filling is minimal.
Infrastructure protection The Development will
PO10 Comply
Earthworks and vehicular access do No acceptable outcome provided
not adversely impact on the capacity,
operations and maintenance of
existing infrastructure.
Environmental protection The Development will
PO11 Comply
Earthworks minimise any adverse No acceptable outcome provided
NMA_ECAR_19323
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.