Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Engineering Code Assessment Report

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

impact upon groundwater,
watercourses, drainage lines,
wetlands, and native vegetation.
Dams                                                                                                            Not Applicable
PO12
Dam location and construction
does not impact upon neighbouring
properties or road reserves, in
terms of—


Table 9.4.3.3
Setbacks, Easements &
Maintenance
PO1                                        No acceptable outcome provided                                       The Development will
Development near a stormwater                                                                                   Comply
drain, overland flow path or
associated structure does not—

          1.    adversely affect the
                function of the service;
          2.    place an additional load
                on the service; and
          3.    unduly increase future
                maintenance costs.

PO2                                        AO2.1                                                                The Development will
Maintenance access is provided to all      For trunk infrastructure, a registered easement in favour of         Comply
stormwater drains, overland flow paths     Council is created over all underground infrastructure located in
and associated structures.                 private property.

                                           AO2.2
                                           The width of the easement required is in accordance with
                                           Council’s Planning Scheme Policy PSP6 Engineering Design
                                           Standards – Roads, drainage and earthworks.

                                           AO2.3
                                           The easement is centred over the centreline of the infrastructure.
Table 9.4.4.3
Fire Services
Installation of hydrant                                                                                         The Development will
PO1                                        AO1.1                                                                Comply
Fire hydrants are installed and            Fire hydrant placement and technical requirements for
located to enable QFES vehicles            residential streets and common access ways within
to access water safely, effectively        common private title are in accordance with:
and efficiently.
                                                     1.   Australian Standard (AS) 2419.1 – 2005 Fire
                                                          hydrant installations; and
                                                     2.   QFES: Fire Hydrant and vehicle access
                                                          guidelines for residential, commercial and
                                                          industrial lots.

                                           AO1.2
                                           Fire hydrant placement and technical requirements for
                                           commercial and industrial streets and access ways within
                                           streets serving commercial properties, such as factories,
                                           warehouses and offices, are in accordance with:

                                                     1.   Australian Standard (AS) 2419.1 – 2005 Fire
                                                          hydrant installations; and
                                                     2.   QFES: Fire Hydrant and vehicle access
                                                          guidelines for residential, commercial and
                                                          industrial lots.



         NMA_ECAR_19323
Log in to download the original file

Engineering Code Assessment Report.pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.